Laserfiche WebLink
TEMPORARY EROSION AND SEDIMENT G <br /> CONTROL NOTES i <br /> NNE • it <br /> I. APPROVAL OF THIS EROSION ANC SEDIMENT CONTROL (ESC) PLAN X S Ne�Ym11101 I <br /> DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR B 8 ® <br /> DRAINAGE DESIGN (E.G., SIZE AND LOCATION OF ROADS, PIPES, glgMINIC <br /> RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.). 3 �' lwiwlM <br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, $ � ,,c..r" <br /> •�, � R <br /> MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC = T •. q�, „ <br /> FACILITIES IS THE RESPONSIBILITY OF THE CONTRACTOR/ESC o .Z �'+ <br /> SUPERVISOR UNTIL ALL CONSTRUCTION IS APPROVED. 'TLii'S '. <br /> rD __ • /Integrity <br /> 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN .? ��,_+ r LAUD �' - /Works! <br /> SHALL BE CLEARLY FLAGGED BY ORANGE CONSTRUCTION FENCING (OR I g OVIPVC IO L"" Consulting Fes•LLC <br /> CHAINUNK FENCING, IF REQUIRED) PRIOR TO CONSTRUCTION. DURING rr,.w curiuu s-nog:.SORE aor <br /> # fi,.(*AA 0002•4 <br /> THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING ,�_ �q E - •»t•nlx%-mu <br /> LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE Dom" <br /> I <br /> MAINTWNED BY THE CONTRACTOR/ESC SUPERVISOR FOR THE DURATION R"�~' �` �"� In r (206,11.1.10 <br /> OF CONSTRUCTION. i .: " •J 5 <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED '. 4' prj�+ 8'r <br /> PRIOR TO OR IN CONJUNCTION WITH ALL CLEARING AND GRADING SO tis E /EGTIONAA 1�'N `� <br /> AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE ¢G¢ le w WPM 6Gp N7�WN01 <br /> WATERS, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED. S bNNOSa A ( 1 :r <br /> 5. THE ESC FAOLITIES SHOWN ON THIS PLAN ARE THE MINIMUM } 0'To S.WWI, SIs ®°N�.,C <br /> REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE FULL�7DIN Trncry mom< "� 7esss ,fir <br /> CONSTRUCTION PERIOD, THESE ESC FACTURES SHALL BE UPGRADED AS o = �TR� Ate" <br /> NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT <br /> rNon CII ' tONAL 'V <br /> W FANW MUST I 1 1yl����I <br /> FOR CHANGING SITE CONDITIONS (E.G., ADDITIONAL SUMP PUMPS, PLY=aY AIN WNW SPALLS. 06/13/13 <br /> RELOCATION OF DITCHES AND SILT FENCES, ETC.). <br /> 6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE L <br /> CONTRACTOR/ESC SUPERVISOR AND MAINTAINED TO ENSUREI :liIl....I CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT eOF WEEKLY REVIEWS OF THE ESC FAOUTES DURING THE WET SEASON E I ' .■.I(OCT. 1 TO APRIL 30) AND OF MONTHLY RENEWS DURING THE DRY , '--�11 Z <br /> 7. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENT$, „ "�• ++ - �-"� �='� l <br /> THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET j <br /> SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE € II II II II u+ <br /> IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS (E.G., • • I� II A II II <br /> SEEDING,MULCHING, PLASTIC COVERING, ETC.). U I' <br /> B. ANY AREA NEEDING ESC MEASURES NOT REQUIRING IMMEDIATE d 0 • u U U <br /> mi <br /> ATTENTION SHALL BE ADDRESSED WITHIN FIFTEEN(15)DAYStI u ()EVA Q <br /> 9 THE ESC FACILITIES OIN INACTIVE SITES SHALL BE INSPECTED AND 6 ig:mr EVERETT <br /> r.,,..,, �, Cin ERFTr 5-11-YDS1 O .. <br /> MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN FORTY-EIGHT 5 CONSTR CIO pE�TITRAFICE �� TEMPORARY SILT FENCE 1. o <br /> (48)HOURS FOLLOWING A STORM EVENT. F PAMISNI5 iR7G'R 2QlaialtalliP (�2�qDVir• � <br /> 2 <br /> 10 AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE <br /> ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. AU.CATCH BASINS ()CONSTRUCTION ENTRANCE ROCK PAD <br /> TO SCALE <br /> t L <br /> f n 1TDEMDPORARY SILT FENCE <br /> AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE <br /> CLEANING OPERATION SHALL NOT FLUSIi SEDIMENT-LADEN WATER INTO NOT �/ <br /> THE DOWNSTREAM SYSTEM. <br /> W Ln <br /> 11. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE J I'l J <br /> INSTAI1 FT) AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR 0 <br /> THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS <br /> r-% O <br /> WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS o <br /> ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. _.(:::2 a- <br /> 12. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS U O U <br /> REWIRED, IT SHALL BE APPLIED AT A MINIMUM THICKNESS OF 2 TO 3 to -J U) <br /> INCHES. LU U <br /> H <br /> J <br /> 13. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL UT LL CO <br /> • DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN 0-1 <br /> BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED <br /> AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE d <br /> LL <br /> WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND ADAPTER SKIRT <br /> i__1 <br /> L_ <br /> THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE <br /> CITY OF KENMORE INSPECTOR. THE CITY INSPECTOR CAN REQUIRE RETRIEVALSTRAP (4) <br /> SEEDING OF ADDITIONAL AREAS IN ORDER TO PROTECT SURFACE Q U <br /> WATERS. ADJACENT PROPERTIES,OR DRAINAGE FACILITIES. 36, U LU <br /> EZ <br /> 14. WHERE SEEDING FOR TEMPORARY EROSION CONTROL IS REWIRED, (17 L.1.1FAST GERMINATING GRASSES SHALL BE APPLIED AT AN APPROPRIATE "+ Q = W <br /> RATE (I.E., ANNUAL OR PERENNIAL RYE APPLIED AT APPROXIMATELY .., U F- LLI <br /> 120 POUNDS PER ACRE). <br /> z <br /> r <br /> (n <br /> SHEET TTI'LE: <br /> GEOTEXTILE `O <br /> FABRICTESL NOTES AND <br /> t <br /> OVERFLOW PORTS(TO DETAILS <br /> SEDIMENT BYPASS PEAK STORM <br /> ACCUMULATION VOLUMES). <br /> `101, 1 <br /> NOTE <br /> FILTERS SHALL BE REMOVED AND CLEANED OR <br /> REPLACED AS NECESSARY Ar!LH EACH STORM DATE: JUNE 13,2013 <br /> EVENT. <br /> CNJA JOB NO.: i2006 <br /> imillinimilmMi <br /> TEMPORARY SEDIMENT CONTROL INLET ONEINCALEH AT ACCOULL RDINGLY 3 <br /> NOT TQ SCALE IF NOT,SCALE ACCORDINGLY <br /> CITY OF EVERETT SHEET: <br /> APPROVED FOR CONSTRUCTION CC <br /> 8 a CALL 2 BUSINESS 1 <br /> DAYS BEFORE YOU 1. l 1 <br /> ,�,�, DIG 811 OR <br /> 1-800-424-5555 cm DNiNEER 01,7 SHEET 8 OF 16 <br />