My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5109 CHINOOK DR 2018-12-21
>
Address Records
>
CHINOOK DR
>
5109
>
5109 CHINOOK DR 2018-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 8:06:36 AM
Creation date
12/21/2018 8:06:18 AM
Metadata
Fields
Template:
Address Document
Street Name
CHINOOK DR
Street Number
5109
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f Y <br /> 1. PROJECT OVERVIEW <br /> This document is intended to provide the engineering information necessary to support the <br /> building permit application for a new single family residence (SFR) and driveway in the City <br /> of Everett. The site covers 0.38 acres. The existing site is currently partially developed and <br /> contains lawn, some brush, and an old garage slab. The proposed disturbance area will <br /> cover approximately 8,987 sf. The proposed SFR will be set approximately 25 feet east of <br /> the western property line. Access to the new SFR will be taken from the proposed paved <br /> driveway which will take access from the existing roadway to the west (Chinook Dr). <br /> The parcel is currently partially developed and is surrounded by developed parcels to the <br /> north, south, and the east. There is an undeveloped parcel to the west of the property. The <br /> slope of the site in the area of the proposed SFR and driveway is moderate and averages <br /> approximately 11 percent down to the northeast. <br /> This development proposes to construct a new SFR with a paved driveway taking access <br /> off of Chinook Dr. The total new plus replaced impervious surfaces equal 3,678 sf (0.09 <br /> acres). <br /> Per Figure 1-2.4.1 (flow chart for determining requirements for new development), this <br /> project is subject to minimum requirements 1-5. The flow chart showing how we came to <br /> this conclusion is included in appendix A. <br /> Roof runoff from the SFR will be infiltrated by two infiltration trenches. All drainage <br /> improvements have been designed to meet or exceed the 2014 DOE Stormwater <br /> Management Manual with modifications and additions contained in the Design and <br /> Development Standards. <br /> The project location is 5109 Chinook Dr, in the City of Everett, and in Section 34, Township <br /> 29N, Range 4E. See Figure 1 -Vicinity Map. <br /> Chinook Dr SFR 17-0802 <br /> Revised: October 2017 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.