Laserfiche WebLink
Estimate Work Sheet <br /> Address: 4220 Colby Ave Date: 5-9-2018 <br /> Job: Colby Prop Mgnt Requested by: Sabrina Fandler <br /> Materials: <br /> Qty '' Size Description EA Ext. <br /> 1 2x6 6"tap saddle w/2" IP tap $34.00 $34.00 <br /> 3 2" 2" copper compression x MIP $60.00 $180.00 <br /> 2 2" 2" HD gate valve $244.00 $488.00 <br /> • <br /> 5yd n/a 3/4 minus gravel $23.00 $115.00 <br /> $ $ <br /> $ $ <br /> $ $ <br /> $ $ <br /> $ $ <br /> Materials (from continuation sheet): 0 <br /> Total Materials: $817.00 <br /> Labor: <br /> Personnel 4 x Hours 4 x Rate $40.00 = $640.00 +benefits (29%) $186.00 = $826.00 <br /> Overhead 53.72% $444.00 Total Labor: $1270.00 <br /> Equipment: <br /> Hours 4 x Rate $_98.00 = $392.00 <br /> Tap Fee: $.00 <br /> Total Equipment: $392.00 <br /> SUMMARY <br /> Total Materials,Labor& Equipment: $2479.00 <br /> Tax(5.03%): $125.00 <br /> GRAND TOTAL: $2604.00 <br /> S:\#Common\clerical\FORMS\Estimate Worksheet.doc <br />