Laserfiche WebLink
INSPECTION REPORT <br /> / Date 3/7-4 Permit: ` k 3-fit/ <br /> :-.,-, <br /> s4ru,, ,4.0_,-1..„ <br /> PII ' Contractor: <br /> Owner: ThY?'S71 AL <br /> Site Address: C.) Li .r--- /1/1U,ea-a ogld . <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ['Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In El Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid El Ceiling Grid <br /> ❑Rough In ❑Structural Slab El OK to insulate ❑OK to insulate <br /> ❑Service El Framing El Rooftop Units ❑Water Service <br /> ❑ rounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ... lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK El Roof Nailing ❑Rough In/Service Hot Water Tank <br /> El Footing drains El Ceiling Grid ❑Refrigeration ❑Rough in <br /> El Roof drains ❑Building Final (n ❑Gas Pipe Finala � ❑HWT Final <br /> OTHER OR CONSULTATION: 20 t 7` 9 7Lal <br /> 1►, 'PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P M/ <br /> r OK FOR T.C.O. El CORRECTION REQUESTED 1- <br /> ❑ OK FOR C.O. ElVIOLATION m <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> i • <br /> \ -ek.t.X <br /> 4' <br /> r_, , .0.- <br /> 66 <br /> ______ <br /> -- <br /> Inspecto : ..,/ Date: _ G vb N.) <br /> ,„ <br /> BR(10/06) DATABAR,INC. <br />