Laserfiche WebLink
Kennedy Court <br /> Rehabilitation Project-Itemized Scope of Work <br /> by building Breakdown <br /> 3228 Units A,B,C,and D Cost of work Permit Review Fees <br /> install dishwasher 4 $ 2,504.00 <br /> vented range hood(4 units) 4 $ 432.00 <br /> kitchen hood exhaust venting 4 $ 2,500.00 <br /> replace tubs and surrounds 4 $ 8,644.00 <br /> Replace lavatory 4 $ 3,152.00 <br /> Install exhaust fans 4 $ 1,186.00 <br /> install exhaust fan ducting 4 $ 600.00 <br /> Install kitchen sink including faucet 4 $ 9,320.00 <br /> install water heater 1 $ 2,041.00 <br /> install wall heaters 2 $ 650.00 <br /> install thermostats 2 $ 330.00 <br /> frame new walls,including drywall $ 4,291.26 <br /> install ADA toilet $ 2,151.00 <br /> Install ADA ramp/reconfigure exterior stairs $ 11,360.00 <br /> Re-roof $ 12,500.00 <br /> repair beams in crawl space $ 750.00 base fee remainder factor unit cost total <br /> Total $ 62,411.26 $730.63 $474.91 $ 643.75 $ 12,411.00 $ 12.41 $ 86.88 $ 730.63 <br /> 3230 Units A and B <br /> install dishwasher 2 $ 1,252.00 <br /> vented range hood(2 units) 2 $ 216.00 <br /> kitchen hood exhaust venting 2 $ 1,250.00 <br /> replace tubs and surrounds 2 $ 4,322.00 <br /> Replace lavatory 2 $ 800.00 <br /> Install exhaust fans 2 $ 296.50 <br /> install exhaust fan ducting 2 $ 150.00 <br /> Install kitchen sink including faucet 2 $ 4,660.00 <br /> laundry room conversion to living space 1 $ 1,395.00 base fee remainder factor unit cost total <br /> Total $ 14,341.50 $ 242.03 $ 157.32 $ 69.25 $ 12,341.50 $ 12.34 $ 172.78 $ 242.03 <br /> 3232 Units A and B and laundry room conversion <br /> install dishwasher 2 $ 1,252.00 <br /> vented range hood(4 units) 2 $ 216.00 <br /> kitchen hood exhaust venting 2 $ 1,250.00 <br /> replace tubs and surrounds 1 $ 2,161.00 <br /> Replace lavatory 2 $ 800.00 <br /> Install exhaust fans 3 $ 889.50 <br /> install exhaust fan ducting 3 $ 450.00 <br /> Install kitchen sink including faucet 2 $ 4,660.00 <br /> install water heater 1 $ 2,041.00 <br /> frame new walls,including drywall 13 If $ 1,430.42 <br /> clothes washer hook-up 3 $ 4,107.00 <br /> clothes dryer hook-up and venting 3 $ 500.00 <br /> Re-roof $ 12,500.00 base fee remainder factor unit cost total <br /> Total $ 32,256.92 $ 464.54 $ 301.95 $ 391.25 $ 7,256.92 $ 7.26 $ 73.29 $ 464.54 <br /> $1,437.20 $934.18 <br /> KIRTLEY-COLE ASSOCIATES LLC 6/7/2016 <br />