iiengine <br /> Minimum Requirement#8—Wetlands Protection(MR#8) <br /> The project site does not discharge directly to a wetland;therefore,this minimum requirement does <br /> not apply. <br /> Minimum Requirement#9—Operation and Maintenance(MR#9) <br /> An operations and maintenance manual for the proposed drainage systems has been provided in <br /> Appendix D of this report. This manual will be kept onsite at the school front office. <br /> OFFSITE ANALYSIS <br /> The following Offsite Analysis was based on the City of Everett's"MapEverett"interactive <br /> mapping tool and the site survey. <br /> Stormwater falling upon the existing natural grass baseball field is collected by an existing 4-inch <br /> perforated underdrain pipes running northwest-southeast within the outfield footprint.The infield <br /> surface is not underdrained. The perforated laterals flow towards 8-inch collector lines running in <br /> the center of the field.The collector lines converge at a type-1 catch basin beneath the field surface <br /> in centerfield.An outlet conveys flow southeast,connecting to the existing 48-inch combined <br /> sewer system.There is a sewer manhole,also located beneath the centerfield surfacing,but based <br /> on field investigation,it does not appear that the storm outlet connects to this manhole. <br /> The 48-inch combined sewer line takes flow off the site near the northeast corner of the property, <br /> eventually a 60-inch system as the sewer system travels west and north.Per City of Everett <br /> mapping,this is noted as the Summit Ave Interceptor combined sewer. The northbound sewer <br /> system,eventually conveys flow to the Water Pollution Control Facility(WPCF)approximately 3 <br /> miles from the site. <br /> Refer to Figure 6—Site Discharge Map for layout of existing drainage and sewer system in the <br /> proximity of the project disturbance area. <br /> PERMANENT STORMWATER CONTROL PLAN <br /> As noted above,the project is required to address Minimum Requirements#1 through#9 for the <br /> new and replaced hard surfaces and the converted vegetation areas for the project area. Per Policy <br /> #2-11,and as described earlier,Minimum Requirement#6 Runoff Treatment is not required. Also <br /> as described earlier in the Minimum Requirements Section of this report shown above,the project <br /> will not increase the 100-year flow by 0.15 cfs,therefore minimum Requirement#7 is also not <br /> required. <br /> Pre-developed Site Hydrology <br /> Refer to Figure 4—Existing Conditions for a layout of the existing surfacing of the field. See the <br /> Offsite Analysis section of this report for more on the existing drainage system. <br /> LPD Engineering, PLLC Page 1 Everett Memorial Stadium Baseball Field Replacement <br /> Storm Drainage Report, September 15, 2011 <br />