My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3721 OAKES AVE EVERETT MEMORIAL STADIUM 2018-12-21
>
Address Records
>
OAKES AVE
>
3721
>
EVERETT MEMORIAL STADIUM
>
3721 OAKES AVE EVERETT MEMORIAL STADIUM 2018-12-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 12:00:53 PM
Creation date
12/21/2018 12:00:40 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
3721
Tenant Name
EVERETT MEMORIAL STADIUM
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PI <br /> engineering p c <br /> CONSTRUCTION STORMWATER POLLUTION PREVENTION <br /> PLAN (SWPPP) <br /> The preliminary SWPPP narrative for this project can be found in Appendix C and is based on the <br /> requirements of Volume II of the Everett SWMM.An NPDES permit from the Washington State <br /> Department of Ecology will not be required for the project,since the project does not discharge to a <br /> surface water of the state,but instead to the sanitary sewer system. This design will include the <br /> following TESC measures: <br /> • Temporary Stabilized Construction Entrance,per BMP C105 <br /> • Interceptor Dike and Swale,per BMP C200 <br /> • Catch Basin Filters,per BMP C220 <br /> • Silt Fence,per BMP C233 <br /> • Temporary Sediment Settling Tank <br /> The TESC plan includes a temporary sediment settling tank.The volume for an equivalent <br /> sediment trap was calculated per section 3.3.17,Volume 2 of Everett SWMM. The 10-year peak <br /> flow was used for sizing due to anticipated winter construction.The minimum sediment tank <br /> volume is shown on the TESC plan,attached in Appendix A.A copy of the Sediment Tank Sizing <br /> Calculations worksheet and associated WWHM output are included in Appendix B. <br /> The TESC elements shown are intended to be the minimum allowable. During construction,the <br /> contractor is responsible for upgrading these facilities as necessary. The implementation of the <br /> TESC plan and construction maintenance,replacement and upgrading of the TESC facilities are the <br /> responsibility of the contractor per the contract documents. The TESC facilities will be constructed <br /> prior to and in conjunction with all clearing and grading activity and in a manner in which sediment <br /> or sediment laden water does not leave the project site,enter the drainage system,or violate <br /> applicable water quality standards. <br /> LPD Engineering, PLLC Page 9 Everett Memorial Stadium Baseball Field Replacement <br /> Storm Drainage Report, September 15, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.