Laserfiche WebLink
Eric Gold <br /> From: Sabrina Fandler <SFandler@everettwa.gov> <br /> Sent: Friday,July 28, 2017 1:36 PM <br /> To: Eric Gold; 'Ben Hughes (BenH@Ipdengineering.com)'; Krause, Steven A. <br /> Cc: Erik Emerson; Paul McKee;Arnie Roshak; Dave Voigt <br /> Subject: Update for Everett Memorial Stadium <br /> Please see below from Dave Voigt with our Combined Sewer area group: <br /> Hello folks, <br /> Sorry for missing the meeting- I never got word of the room change and assumed it was cancelled. <br /> I do have some input for your design team regarding the proposed site improvements. Without getting into too much <br /> detail, please be advised that the City is interested in exploring an alternative that should make your project easier to <br /> implement, perhaps less costly while at the same time significantly reducing the impacts of wet weather drainage on the <br /> City's combined sewer system. The following are some highlights: <br /> • Assuming your drainage modeling determines that some new detention is needed, locate that new detention <br /> elsewhere—the 3.6 ac south parking lot is recommended. <br /> • OK to connect baseball field underdrain network directly to the city sewer without detention. <br /> • City and Everett Schools could partner to pay for and build the total detention volume needed for the 3.6 ac <br /> parking lot. <br /> • Cost sharing topic probably needs some discussion (Paul McKee). <br /> Recommend you proceed with your drainage modeling to quantify detention volumes, but don't spend time trying to <br /> locate detention facilities on the baseball field site. <br /> David Voigt, P.E. <br /> Senior Engineer, Project Manager <br /> City of Everett, Public Works <br /> Phone 425-257-8983 <br /> Email:DVoigt(a�everettwa.gov <br /> Thank you, <br /> Sabrina Fandler, EIT, LEED®AP BD+C <br /> City of Everett Public Works Department I Development Technician <br /> 3200 Cedar St, Everett, WA 98201 <br /> Office: 425-257-8810 <br /> Direct: 425-257-7813 <br /> Email: SFandler(c.everettwa.gov <br /> 41. M wzhtxsr <br /> The Permit Services Counter is located on the 2nd Floor. <br /> Hours of Operation: Monday-Friday 7:30am-12:00pm and 1:00pm-4:OOpm. <br /> All emails, and attachments, sent to and from City of Everett are public <br /> records and may be subject to public disclosure pursuant to RCW 42.56. <br />