My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4702 ELM ST 2018-12-26
>
Address Records
>
ELM ST
>
4702
>
4702 ELM ST 2018-12-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 10:18:28 AM
Creation date
12/26/2018 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
ELM ST
Street Number
4702
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 2 <br /> 8/21/2018 16:51 <br /> Issued By CSG CAVANAH,SHANE G. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 6/27/2018 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 675 <br /> Program <br /> Title REPAIR.75 INCH 4702 ELM ST 710119675 <br /> Work Order No 20181768 Project Activity Type SERVICE REQUEST Status CL <br /> Status 6/27/2018 Time 08:37 Original WO Billing <br /> Problem Details <br /> CALLED WTE, PRINTED TO METER SHOP. LEAK ON SETTER. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS3694Q013 WASRVC YES 6/30/2018 <br /> Address 4702 ELM ST <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 4702 ELM ST <br /> Location <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> ✓ J0134 16 FORD F550 4X2 1.5 TON EXT C 4 43.2 06/26/2018 <br /> Total Vehicle Cost $43.20 <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P ARP ANDERSON, ROGER P. 4 60 06/26/2018 <br /> P PS PEREZ,SERGIO 4 126.344 06/26/2018 <br /> Total Personnel Cost $186.34 <br /> Total Cost $229.54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.