My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6502 EVERGREEN WAY 2018-12-26
>
Address Records
>
EVERGREEN WAY
>
6502
>
6502 EVERGREEN WAY 2018-12-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 10:26:21 AM
Creation date
12/26/2018 10:26:20 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
6502
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street ��. T�� <br /> Everett WA 98201 1IA <br /> 425-257-8800 <br /> COST ESTIMATE SHEET NOV 0 1 201? 2?: <br /> Receipt # Date Paid <br /> X Cost of Work Order $11461.00 Work Order# <br /> Cost of Service Order - Service Order# <br /> Contact Person Todd Madison Telephone# 206 619-5555 <br /> Requested By Sabrina Fandler Date of Request 9-28-2017 <br /> Property Owner(name) Madison Real Property LLC . <br /> Charge Cost to(name if different than owner) <br /> Address PO Box 31609 City Seattle, WA Zip 98103 <br /> Installation Location 6502 Evergreen Way <br /> Installation type/description/size/etc. Tap existing 6" D.I. with 6 inch, cross Fleming and install <br /> fire hydrant. C.O.E.will excavate, shore, restore and provide traffic control. <br /> The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. # <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $4283.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $3807.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $1350.00 Paul McKee <br /> Tax $475.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration $1546.00 Sabrina Fandler <br /> TOTAL $11461.00 Benyam Stephanos <br /> Prepared by: Jim S•..oner .4:449 Date Estimate Prepared 10/31/2017 <br /> Accepted by: ter- -- Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\6502 Evergreen Way 6 inch CEFP <br /> 1of1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.