Laserfiche WebLink
PUBLIC WORKS DEPARTMENT <br /> Utilities Division,3200 Cedar Street ��. T�� <br /> Everett WA 98201 1IA <br /> 425-257-8800 <br /> COST ESTIMATE SHEET NOV 0 1 201? 2?: <br /> Receipt # Date Paid <br /> X Cost of Work Order $11461.00 Work Order# <br /> Cost of Service Order - Service Order# <br /> Contact Person Todd Madison Telephone# 206 619-5555 <br /> Requested By Sabrina Fandler Date of Request 9-28-2017 <br /> Property Owner(name) Madison Real Property LLC . <br /> Charge Cost to(name if different than owner) <br /> Address PO Box 31609 City Seattle, WA Zip 98103 <br /> Installation Location 6502 Evergreen Way <br /> Installation type/description/size/etc. Tap existing 6" D.I. with 6 inch, cross Fleming and install <br /> fire hydrant. C.O.E.will excavate, shore, restore and provide traffic control. <br /> The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. # <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $4283.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits $3807.00 Matt Welborn <br /> Randy Allen <br /> Equipment Rental $1350.00 Paul McKee <br /> Tax $475.00 Jim Spooner <br /> Kirk Brooks <br /> Restoration $1546.00 Sabrina Fandler <br /> TOTAL $11461.00 Benyam Stephanos <br /> Prepared by: Jim S•..oner .4:449 Date Estimate Prepared 10/31/2017 <br /> Accepted by: ter- -- Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Cost.est\2015\6502 Evergreen Way 6 inch CEFP <br /> 1of1 <br />