Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 9/12/2018 9:24 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 8/7/2018 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 16 3 <br /> Title CONVERT.75 INCH 2216 GIBSON PL UT3473-16-3 <br /> Work Order No 20182039 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 8/7/2018 Time 14:42 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WASRVC YES 8/8/2018 <br /> Address <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.324 08/10/2018 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 191.26 08/10/2018 PM <br /> M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO 1 101.54 08/10/2018 PM <br /> Total Material Cost368.12 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 08/10/2018 <br /> NA N/A TOPSOIL .13 3.851 08/10/2018 <br /> Total NA Cost $10.26 <br /> Total Cost $378.38 <br />