My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3000 ROCKEFELLER AVE BASE FILE 2018-12-26
>
Address Records
>
ROCKEFELLER AVE
>
3000
>
BASE FILE
>
3000 ROCKEFELLER AVE BASE FILE 2018-12-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2018 3:21:41 PM
Creation date
12/26/2018 3:21:41 PM
Metadata
Fields
Template:
Address Document
Street Name
ROCKEFELLER AVE
Street Number
3000
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS DEPARTMENT eV <br /> Utilities Division,3200 Cedar Street = <br /> Ev ! <br /> Everett WA 98201 <br /> 425-257-8800 <br /> COST ESTIMATE SHEET <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> X Cost of Service Order $1796.00 Service Order# <br /> Contact Person John Turk Telephone# 206 992-0554 <br /> Requested By Jim Spooner Date of Request 2-20-18 <br /> Property Owner(name) Snohomish County <br /> Charge Cost to(name if different than owner) David Chapman/McKinstry Co <br /> Address 5005 Third Ave South City Seattle,WA Zip 98134 <br /> Installation Location 3000 Rockefeller Ave/East Admin Bldg <br /> Installation type/description/size/etc. Deliver 2 ea. 2" T-10 neptune meter w/R9001 e-coder and <br /> 1 ea 1" neptune meter w/R9001 e-coder to McKinstry for installation on cooling towers. <br /> These meters will be used for deduct reads for water on cooling towers. <br /> Please note: Estimate is for meters only all other work to be done by contractor. <br /> ❑ The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-up. <br /> Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total expense for labor,material,equipment rental and <br /> administrative costs,the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and provided further,that any excess payment shall be returned to the person applying for the <br /> installation. <br /> *Deposit must be paid prior to ordering parts or scheduling work. <br /> *Must have valid Public Works Permit before work can be performed. <br /> WATER METERS 4"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> Material $1710.00 cc: Bldg.Permit Center <br /> Mark Sadler <br /> Labor and Benefits Matt Welborn <br /> Equipment Rental Randy Allen <br /> Paul McKee <br /> Tax $86.00 Jim Spooner <br /> Sabrina Fandler <br /> Restoration Benyam Stephanos <br /> TOTAL $1796.00 <br /> Prepared by:(/' 2 Jim Spooner Date Estimate Prepared 2-20-2018 <br /> Accepted by: Representing <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> S:\#Common\clerical\Costest\201813000 Rockefeller 2 CEFP <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.