My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11020 19TH AVE SE BASE FILE 2019-06-06
>
Address Records
>
19TH AVE SE
>
11020
>
BASE FILE
>
11020 19TH AVE SE BASE FILE 2019-06-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/6/2019 1:30:17 PM
Creation date
12/27/2018 7:47:11 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11020
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Activity Work Order Page 2 <br /> 8/22/2018 8:28 <br /> Issued By HLJ HUSBY,LANCE J. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 2/26/2018 <br /> Fund 401 Account 5 Program 710 Function 119 Activity 677 <br /> Program <br /> Title REPAIR FIRE HYDRANT 11020 19TH AVE SE 710119677 <br /> Work Order No 20180651 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 3/8/2018 Time 12:13 Original WO Billing <br /> Problem Details <br /> BILL TO CASE#2018-18632 PROGRESSIVE#184809484 <br /> FIRE HYDRANT HIT BY CAR, REPLACE BREAK AWAY KIT AND <br /> STRAIGHTEN HYDRANT. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WFH1985R06 WAHYD YES 3/8/2018 <br /> Address 11020 19TH AVE SE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 110TH ST E-SW COR INT 19TH A <br /> Location <br /> Vehicle Costs <br /> Type Vehicle No Description Hours Cost Billing Date Billing Code Warehouse <br /> V J0133 16 FORD F550 4X2 1.5 TON EXT C 2 19.6 03/08/2018 <br /> Total Vehicle Cost $19.60 <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M KIT000087247 BREAK FLANGE REPAIR KIT FOR MUELLER 5-1/4"HYDRANT AFTER1972 1 224.343 02/26/2018 PAP <br /> Total Material Cost COP <br /> Personnel Costs <br /> Type ID Name Hours Cost Billing Date Earning Code Class <br /> P KTJ KELSO,THOMAS J. 2 70.058 03/08/2018 <br /> Total Personnel Cost $70.06 <br /> Total Cost $314.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.