GE DEsIGNz L ( e6, T\ FIELD R z <br /> 1 of <br /> Project Name: Everett River Front-Simpson Report: 074 <br /> GeoDesign#: Polygon-127-03 Date: 10/13/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Rain, 50's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 0800/0830 <br /> Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) Prepared By: Ben Weinberg, EIT <br /> Attachments: <br /> El -; <br /> Site Plan(s) 0 Density Test Summary Signature: 4 <br /> ❑ Installation Records 0 Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of John Feltner with <br /> Polygon to observe foundation subgrade for Lots 250 and 251. <br /> SUMMARY OF OBSERVATIONS: <br /> LOT 250: <br /> Previously, GeoDesign noted loose and saturated material which could be probed 1 to 1.5 feet along the northwest corner <br /> of the foundation area just outside of the perimeter footing. GeoDesign recommended that the material be removed down to <br /> firm and unyielding material and replaced with a clean crushed rock material. Today, GeoDesign noted that the loose <br /> material in the northwest corner had been over-excavated approximately 1.5 to 2.0 feet down to firm and unyielding <br /> material. GeoDesign noted that the loose material along the north side appeared to extend farther to the east,with some <br /> saturated material yielding underfoot. <br /> GeoDesign notified the client and contractor that the over-excavated area was currently suitable for placement of backfill <br /> material and recommended that the loose and saturated material which continued to the east be over-excavated down to <br /> firm and unyielding material and replaced with a clean crushed rock material. <br /> LOT 251: <br /> Previously, noted loose and saturated material which could be probed approximately 8-12 inches in the southeast corner of <br /> the foundation area and approximately 3 inches of surficially loose and saturated material along the west perimeter of"the <br /> foundation area. GeoDesign recommended that the material in these areas be removed down to firm and unyielding <br /> material and replaced with a clean crushed rock material. Today, GeoDesign noted that DDS had over-excavated/cleaned <br /> off the previously identified areas and backfilled the area with a clean angular crushed rock material tamped into a firm and <br /> unyielding mass. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade for Lot 251 is currently suitable for support of the <br /> intended structure. GeoDesign recommends that any surficially loose and saturated material that is generated be removed <br /> from the base of foundations prior to the placement of concrete. <br /> The client and contractor were notified of our observations and recommendations prior to our departure from the site today. <br /> A summary of our observations can be found in the attached Figure 1. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />