Laserfiche WebLink
-RCS <br /> Avaire Apartments TO: Basis Architecture&Consulting DATE: May 1, 2017 <br /> ATTN: Tessa PAGE: 1 of 1 <br /> REQUEST FOR INFORMATION <br /> JOB NAME: Avaire Apartments JOB NO: 101 RFI#: 1 <br /> REFERENCE TO DRAWING/SPEC: A 2.1 (view of decks only) <br /> RFI DESCRIPTION: • <br /> Most of the existing decks have some degree of rot on the existing sheathing behind the deck framing. It <br /> appears to be less labor intensive and more cost effective to remove the deck framing members so the <br /> necessary rot can be replaced/repaired. The existing decking (2x4) is currently scheduled for replacement. <br /> The attachment included identifies the proposed fix of the existing wing walls (replace like for like)with notes <br /> identifying the new attachment of any/all replaced decks. Please confirm or comment on these condtions. All <br /> existing decks are similar in attachment. <br /> COST IMPACT: Yes [ ] No [ ] TB TBD XX Schedule Impact: Yes [ ] No [ ] TBD XX <br /> REPLY REQUESTED BY: ASAP <br /> ORIGINATOR: James Rochlin FIRM: SREI-RCS DATE: 5/1/2017 <br /> PROJ.TEAM: <br /> RFI RESPONSE <br /> ARCHITECT REVIEW/COMMENT/DIRECTION: <br /> ARCHITECT DATE: ARCHITECT NAME: <br /> CONSULTANT REVIEW/COMMENT/DIRECTION: <br /> Refer to the attatched PDF of contractor photos and comments with ZFA response comments added. <br /> CONSULTANT DATE: May 2, 2017 CONSULTANT NAME: ZFA-Tom Curtis <br /> OWNER(S) COPIED ON RESPONSE: <br /> )1C) r <br /> W:\2017\17054 Avaire Garage Building Conversion\Construction\RFIs\Apt. Buildings\RFI 001\2017-05-02_ZFA <br /> Response_RFI 001- Deck repair.xls Pagq-1- <br />