Laserfiche WebLink
ti . a <br /> Plan Check Response., <br /> (Page 2 <br /> Construction <br /> 1. No parking canopies will be removed. Only one garage structure exists, which will be <br /> converted to a lease office. Notes updated on cover sheet, see Project Data. <br /> Acce sibility <br /> Unit types revised to numerical values, throughout entire set. <br /> a. See unit type 2A for historically accessible unit plan, sheet A4.1. <br /> b. See revised site plan for location of historical accessible units (unit type 2A), sheet <br /> A0.1. There are four units that will have new bedrooms from converted common <br /> laundries. These are Type 3 units (See A4.1)Type 3 units are not located on an <br /> accessible path of travel and it is technically infeasible to make these units <br /> accessible due to sloped exterior and constrained interiors. Accessible path of travel <br /> upgrades to be made at Type 2A units (See above).The second bedroom will have <br /> baseboard heating,wall insulation, and various electrical upgrades to comply with <br /> code. <br /> c. Accessible parking and curb cut ramps are now shown on the site plan adjacent to <br /> the existing historically accessible units, see sheet A0.1 and A0.3. <br /> d. Conforming parking spaces with curb cut ramps are now shown on the plans, see <br /> sheet A0.1 and A0.3. Accessible door hardware is now shown on unit type 2A plans, <br /> sheet A4.1. <br /> e. Parking spaces are now located and dimensioned on the plans, see sheet A0.1 and <br /> A0.3. <br /> f. New signage indicated on plans, see sheet A0.1 and A0.3. <br /> 2. Additional accessible improvements to the primary function areas are not required as we <br /> have already met and exceeded the 20%threshold. <br /> Energy <br /> 1. Forms enclosed: <br /> a. Prescriptive Worksheet <br /> b. Alterations Worksheet <br /> c. Glazing Schedule <br /> d. Energy Credit Options <br /> e. Heating System Sizing Worksheet <br /> 2. NEEC Building Envelope, Lighting, and Mechanical reports enclosed. <br /> 3. See separate permit drawings for MEP work (submitted to the City on 3/29/17). <br /> I trust that the above information is fully responsive to your concerns. As always,we are available if <br /> there are any further questions. Thank you. <br /> Sincerely, <br /> Charles Pick,Architect <br />