My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
824 W CASINO RD BLDG D 2019-03-22
>
Address Records
>
W CASINO RD
>
824
>
BLDG D
>
824 W CASINO RD BLDG D 2019-03-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 7:36:09 AM
Creation date
12/27/2018 3:10:30 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
824
Tenant Name
BLDG D
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
mow,. <br /> March 28, 2017 <br /> Ms. Meg Haley, Plan Review Architect <br /> Permit Services, City of Everett,WA <br /> 3200 Cedar Street ' , . <br /> Everett,WA 98201 , � <br /> RE: Avaire Apartments - Renovation € "1 <br /> 824 W Casino Road Bldg A through L ��, Pa .,.,., <br /> Permit No.: B1702-023 through -034 ', �j • <br /> a"•� t q r <br /> Dear Ms. Haley, fro- <br /> '` . <br /> The plans have been revised in response to your plan review. Revisions are clouded with a "delta" 2, <br /> dated 3/28/17. Please note that an earlier revision took place for Owner Revisions,which is marked <br /> and clouded with "delta" 1, dated 3/15/17. These revisions included clarification of Occupancy at <br /> the garage conversion and reduction of unit interior scope of work items. <br /> General <br /> 1. Method of compliance with IEBC has been added to the cover sheet under Scope of Work <br /> / and Project Data and are as follows: <br /> a. Level Ill alterations: Lease Office Conversion from Garage. <br /> b. Levee Iterations: Bedroom Conversion from Laundry. <br /> c. Repairs: Balance of rehab. <br /> 2. The cost of the building enclosure revisions exceeds 5% of the Snohomish County <br /> Assessor's market improvement value per building. <br /> a. Signed certification added to cover sheet. <br /> 3. We have identified $40,000 to convert (4) "accessible" laundry rooms into bedrooms.The <br /> J,/ cost to improve the Path of Travel at the 5 historical units is approximately$30,000,which <br /> is more than the required 20%($8,000). See sheet A0.1, accessible parking stalls and path <br /> of travel added at (5) units. <br /> Occupancy <br /> 1. See sheet A1.4, Egress plan. <br /> 2. The occupancy has been revised to `B'; see cover sheet. Occupancy will not exceed total <br /> shown on A1.4. <br /> "3. The occupancy has been revised to `B'; see cover sheet. The space will not have fixed <br /> seating and will be flexible with no specific uses identified at this time. <br /> 4. Notes added to floor plan, see sheet A1.3. Typical furnishings now shown in common room. <br /> a. Notes added to door schedule, sheet A6.1. <br /> R.C. Box 150539 <br /> San Rafael,California 94915 <br /> www.bas}sarch.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.