My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
824 W CASINO RD BLDG E 2019-03-22
>
Address Records
>
W CASINO RD
>
824
>
BLDG E
>
824 W CASINO RD BLDG E 2019-03-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2019 7:36:23 AM
Creation date
12/27/2018 3:24:27 PM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
824
Tenant Name
BLDG E
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 28, 2017 <br /> Ms. Meg Haley, Plan Review Architect <br /> Permit Services, City of Everett,WA <br /> 3200 Cedar Street r t <br /> Everett,WA 98201 ^ � qp <br /> ..._ <br /> RE: Avaire Apartments - Renovation \\;-/j <br /> 824 W Casino Road Bldg A through L c\ KA,• a <br /> Permit No.: B 1702-023 through -034 `� � '� <br /> Dear Ms. Haley, = err'` <br /> The plans have been revised in response to your plan review. Revisions are clouded with a "delta" 2, <br /> dated 3/28/17. Please note that an earlier revision took place for Owner Revisions,which is marked <br /> and clouded with "delta" 1, dated 3/15/17. These revisions included clarification of Occupancy at <br /> the garage conversion and reduction of unit interior scope of work items. <br /> General <br /> 1. Method of compliance with IEBC has been added to the cover sheet under Scope of Work <br /> / and Project Data and are as follows: <br /> a. Level III alterations: Lease Office Conversion from Garage. <br /> b. Level,Iterations: Bedroom Conversion from Laundry. <br /> c. Repairs: Balance of rehab. <br /> 2. The cost of the building enclosure revisions exceeds 5% of the Snohomish County <br /> Assessor's market improvement value per building. <br /> a. Signed certification added to cover sheet. <br /> 3. We have identified $40,000 to convert (4) "accessible" laundry rooms into bedrooms. The <br /> / cost to improve the Path of Travel at the 5 historical units is approximately$30,000,which <br /> is more than the required 20% ($8,000). See sheet A0.1, accessible parking stalls and path <br /> of travel added at (5) units. <br /> Occupancy <br /> 1. See sheet A 1.4, Egress plan. <br /> 2. The occupancy has been revised to 'B'; see cover sheet. Occupancy will not exceed total <br /> shown on A1.4. <br /> `' 3. The occupancy has been revised to `B'; see cover sheet. The space will not have fixed <br /> seating and will be flexible with no specific uses identified at this time. <br /> 4. Notes added to floor plan, see sheet A1.3. Typical furnishings now shown in common room. <br /> a. Notes added to door schedule, sheet A6.1. <br /> P.O. Box 150539 <br /> San Rafael.California 94915 <br /> ww,hr.basisarch.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.