Laserfiche WebLink
f -' \ <br /> 44. <br /> f:// <br /> ..1�. <br /> TRUE NORTH <br /> CONSIRui TION MANAGE MI NT <br /> N(' <br /> November 3o,2017 <br /> City of Everett Permit Services <br /> 3200 Cedar Street <br /> Everett,WA 98201 <br /> RE: Avaire Apartments—Building F- RCW 64.55 Compliance <br /> Permit#B1.7o2-o28 <br /> To Whom It May Concern: <br /> True North Construction Management,Inc.(TNCM)was retained by Casino-Westmont Affordable Housing <br /> Partners to provide for 3rd party inspections of the exterior envelope during the remediation process which <br /> included WRB,Siding,and Window replacements. The remediation repairs were performed utilizing plans and <br /> specifications prepared by Basis Architecture and Consulting,the project Architect. <br /> Our scope of services on this remediation included review of the envelope details and site visits to observe and <br /> document the installation of building envelope components during the course of construction as required by RCW <br /> 64.55. It is the opinion of TNCM that the project has been built in general conformance with the remediation <br /> plans and specifications as updated during construction. <br /> Should you have any questions or comments regarding this letter,please feel free to contact me. <br /> Best Regards <br /> SAA <br /> 4.1 <br /> OV <br /> (/):// <br /> Jeff Samdal,PE <br /> Principal l Project Manager �' " z <br /> True North Construction Management,Inc. /��/' C? � Gl3 85 p w,. <br /> • Sky© A �yC1., <br /> Cc: James Rochlin,SRI-Rochlin Construction Services JV LLC <br /> r <br /> Casino-Westmont AH Partners,LLLP <br /> ,MAIN 206-259-5844 1 X 206.259-2710 ! w1Ri1ENO Rr1ICM cokt PO Box 2411 I WOODINV1LLE,WA 98072-2411 <br />