Laserfiche WebLink
t A -i <br /> �I <br /> TRUE NORTH <br /> c:ONs1 RUC 1 ION MANAG[MI N r <br /> iNc <br /> November 30,2017 <br /> City of Everett Permit Services <br /> 3zoo Cedar Street <br /> Everett,WA 98201 <br /> RE: Avaire Apartments—Building G- RCW 64.55 Compliance <br /> Permit#B3.7o2-o2g <br /> To Whom It May Concern: <br /> True North Construction Management,Inc-(TNCM)was retained by Casino-Westmont Affordable Housing <br /> Partners to provide for 3rd party inspections of the exterior envelope during the remediation process which <br /> included WRB,Siding,and Window replacements. The remediation repairs were performed utilizing plans and <br /> specifications prepared by Basis Architecture and Consulting,the project Architect. <br /> Our scope of services on this remediation included review of the envelope details and site visits to observe and <br /> document the installation of building envelope components during the course of construction as required by RCW <br /> 64.55. It is the opinion of TNCM that the project has been built in general conformance with the remediation <br /> plans and specifications as updated during construction. <br /> Should you have any questions or comments regarding this letter,please feel free to contact me. <br /> Best Regards, <br /> r- � Y <br /> Jeff Samdal,PE <br /> Principal I Project Manager • is <br /> True North Construction Management,Inc. 400•77‘37404t, 4F 1.0s9B5,0 <br /> Cc: James Rochlin,SRI-Rochlin Construction Services JV LLC <br /> Casino-Westmont AH Partners,LLLP <br /> ntAit.206-259-5844 I tAX 206-259-2710 I 'URUEN0R1'1{CM('tlkt PO BOX 2411 1 WOOD INVILLE,WA98072-24tt <br />