Laserfiche WebLink
'11111 -1 COST ESTIMATE SHEET <br /> Public Works Department <br /> Streets Division <br /> 3200 Cedar Street Everett WA 98201 <br /> 425-257-8821 <br /> Fax 425-257-8882 <br /> Date g�Q 1 r <br /> Work Order # 20050387 <br /> Service Order # 00177635 <br /> Contact Person Telephone #(9-02-,5) alp - 2-7r, <br /> Requested By <br /> Property Owner (Name) Geoffrey Thomas <br /> Address: 6211 Sycamore PI City Everett Zip 98201 <br /> Installation Location same as above <br /> Installation type/description/size/etc. Remove and replace sidewalk 125'x5'x4" = 7.75 cubic yds concrete Ccs <br /> $104.50 per yd <br /> ** Customer would like to make payments of$100.00 per month i <br /> The estimate includes the Street Division work group providing all labor, equipment and restoration. <br /> By signing this estimate, you give the City permission to enter upon your private property to complete <br /> the work and to use your outdoor water faucet for the project. <br /> Itemized Cost Estimate: <br /> Concrete 7.75 cubic yds (a $104.50 <br /> TOTAL $817.63 <br /> Prepared by: K.C. McAuliffe Date Estimate Prepared: 7/11/18 <br /> Accepted by: ;ties /_ -/to-pfiA Representing: <br /> (Signature) <br /> Please sign and return estimate to above address, Attn. Bob Sorgen <br /> ESTIMATE GOOD FOR 6 MONTHS <br /> Estimate Only <br /> Cc: Paul Kaftanski DO NOT SEND CHECK <br /> Grant Moen <br /> S:\BSorgen\Est\6211SycamoreCOST ESTIMATE SHEET1.doc <br />