My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4319 30TH DR SE 2018-12-28
>
Address Records
>
30TH DR SE
>
4319
>
4319 30TH DR SE 2018-12-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2018 11:47:44 AM
Creation date
12/28/2018 11:47:37 AM
Metadata
Fields
Template:
Address Document
Street Name
30TH DR SE
Street Number
4319
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c )406 - 0i2/ ; 10 004#0 <br /> , <br /> 3M01 .br- <br /> Project Name: Everett River Front-Simpson Report: 096 <br /> GeoDesign#: Polygon-127-01 Date: 7/12/2016 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> DFR 052 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Sunny, 70's <br /> Ron Bowen(Polygon) Arrival/Departure: 1145/1715 <br /> Distribution: <br /> Doug Ross(Polygon) <br /> Paul McKee(City of Everett) Prepared By: Benjamin Weinberg <br /> m Site Plan(s) m Density Test Summary Signature: <br /> Attachments: ❑ Installation Records ❑ Other <br /> Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Benjamin Weinberg, was on-site at the request of Doug Ross with <br /> Polygon to observe earthwork activities. <br /> SUMMARY of OBSERVATIONS: <br /> GeoDesign noted that BDZ was in the process of setting hubs for the grading of Road B, Road C, D/W"N", and D/W"K". <br /> Today, GeoDesign noted that the foundation excavation subcontractor had cut the foundations for Lots 147, 154, and 158. <br /> GeoDesign noted that the concrete contractor had formed and placed reinforcing steel for the foundation for Lot 147 and <br /> was in the process of forming the foundation area for Lots 154 and 158. <br /> Lot 147 <br /> GeoDesign noted that the exposed foundation subgrade for Lot 147 consisted of a brown silty SAND (f-m)with gravel (f-c) <br /> which could be probed less than 2 inches using a 1/2 inch diameter soil probe under the full weight of the user. In-place <br /> density tests taken directly outside of the formed foundation area(and which had the same probing resistance as exposed <br /> material within the forms) indicated that fill material had been compacted to greater than 95%of its maximum dry density as <br /> determined by a Modified Proctor analysis. It is the opinion of GeoDesign that the exposed foundation is currently suitable <br /> for support of the intended load. <br /> Lot 153 <br /> GeoDesign noted th exposed foundation subgrade for Lot 154 generally consisted of a brown silty SAND(f-m)with gravel <br /> (f-c)which could b probed less than 2 inches using a 1/2 inch diameter soil probe under the full weight of the user. <br /> In-place density, sts taken under the foundation area indicated that the exposed foundation subgrade had been <br /> compacted to greater than 95%of its maximum dry density as determined by a Modified Proctor analysis. It is the opinion of <br /> GeoDesign that the exposed foundation is currently suitable for support of the intended load. <br /> Lot 158 <br /> GeoDesign noted that exposed foundation subgrade for Lot 158 generally consisted of a brown silty SAND (f-m)with gravel <br /> (f-c)which could be probed less than 2 inches using a 1/2 inch diameter soil probe under the full weight of the user. <br /> In-place density tests taken under the foundation area indicated that the exposed foundation subgrade had been <br /> compacted to greater than 95%of its maximum dry density as determined by a Modified Proctor analysis. It is the opinion of <br /> GeoDesign that the exposed foundation is currently suitable for support of the intended load. <br /> A summary of our observations and the density tests taken today can be found in the attached Figure 1 and Nuclear <br /> Density Gauge Data. <br /> The client and contractor were notified of our observations prior to our departure from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not indude supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by Initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 210 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />
The URL can be used to link to this page
Your browser does not support the video tag.