Laserfiche WebLink
G Eo DESIGNW. FIELD REPORT <br /> Project Name: Everett River Front-Simpson _Report: 064 <br /> GeoDesign#: Polygon-127-03 Date: 07/28/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW 1505-005 <br /> �ry'', ,., 'a' �"?,�'_._.a ;.;'• .. :.se.;x_ aas,. " 9�.z.''�.' •a .zue. .. ;•".F; „ >., „ 't ..:tia.,.'.4100Att <br /> Nick Abdelnour(Polygon) I Randy Allen(City of Everett) Weather.Clear,60-70's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) Arrival/Departure: 0945/1015 <br /> Distribution: Kirk Keck(Cityof Everett) <br /> Ross(Polygon) <br /> Paul McKee(City of Everett) j Dave Foster(City of Everett) Prepared By Ben Weinberg, EIT <br /> 0 Site Plan(s) 0 Density Test Summary Signature: 07:,- <br /> Attachments: ❑ Installation Records m Other Reviewed By <br /> SUMMARY of OBSERVATIONS(CONTINUED): <br /> LOT 248: <br /> Previously GeoDesign noted that DDS had over-excavated the Lot 248 area approximately 4 feet down to firm and <br /> unyielding material and backfilled the lot area to approximately 2 feet below plan bottom of footing.Today,GeoDesign <br /> noted that BDZ had completed backfilling the lot are to near its plan bottom of footing using a cement-treated material.The <br /> material had been compacted into a firm and unyielding mass using a smooth-drum vibratory roller. Penetration depths <br /> encountered across the lot area were generally less than 2 inches using a 1/2 inch diameter soil probe. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade material observed today is currently suitable for <br /> support of the intended structure.GeoDesign recommends that any loose and saturated material be removed from the base <br /> of the footings prior to placement of concrete. <br /> A summary of our observations and density tests can be found in the attached Figure 1 and Photo Log. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative.Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents.Our firm is not responsible for site safety.This field report Is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By"section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 3 / 1.3° <br />