GEODESIGN u FIELD REPORT <br /> 1 of 4 <br /> Project Name: Everett River Front-Simpson Report: 066 <br /> GeoDesign #: Polygon-127-03 Date: 08/01/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> 1:M1505-005 <br /> Nick Abdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear, 60-70's <br /> Ron Bowen(Polygon) Eddy Stevens(Polygon) 1 Arrival/Departure: <br /> 1015/1045 <br /> 1 Distribution: <br /> Doug Ross(Polygon) Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) Dave Foster(City of Everett) i Prepared By: Ben Weinberg, EIT <br /> m Site Plan(s) ❑ Density Test Summary Signature -- <br /> ____ <br /> Attachments: ° <br /> El Installation Records m Other Reviewed By: <br /> PURPOSE of VISIT: GeoDesign representative, Ben Weinberg, was on-site part time at the request of Leroy with BDZ to <br /> observe foundation subgrade for Lots 244 and 245. <br /> SUMMARY of OBSERVATIONS: <br /> LOT 244: <br /> Previously GeoDesign noted that BDZ had over-excavated the Lot 244 area approximately 1.5 to 5 feet down to firm and <br /> unyielding material and partially backfilled the area with a cement-treated material. Today, GeoDesign noted that the <br /> contractor had completed backfilling the over-excavated area to near plan bottom of footing. GeoDesign noted that the <br /> material had been mixed and spread using a Komatsu PC 300 excavator and compacted into a firm and unyielding mass <br /> using a smooth-drum vibratory roller. Penetration depths encountered for the material placed today was approximately 2-4 <br /> inches shortly after compaction. Material placed on the east side of the lot area yesterday could be probed less than 2 <br /> inches today. <br /> It is the opinion of GeoDesign that the exposed foundation subgrade material observed today is currently suitable for <br /> support of the intended structure. GeoDesign recommends that any loose and saturated material be removed from the base <br /> of the footings prior to placement of concrete. <br /> LOT 245: <br /> Today, GeoDesign noted that BDZ completed excavation of Lot 245 down to firm and unyielding material, which required <br /> 4-5 feet of over-excavation, using a Komatsu PC300 excavator. GeoDesign noted that the exposed base of the <br /> over-excavated area generally consisted of a gray-brown silty SAND with gravel which could be probed less than 2 inches <br /> using a 1/2 inch diameter soil probe. After observing the base of the over-excavated area, GeoDesign notified Leroy with <br /> BDZ that the over-excavated lot area was currently suitable for placement of backfill material. GeoDesign noted that BDZ <br /> backfilled the over-excavated area with a cement-treated gray-brown silty SAND (f-m)with gravel (f-c)which was previously <br /> above its optimum moisture content. GeoDesign noted that the cement dust was added to stockpiles of material outside the <br /> foundation area and thoroughly mixed using the bucket of an excavator. GeoDesign noted that the material was mixed, <br /> placed, and spread in approximately 18 inch loose lifts using a Komatsu PC300 excavator and compacted into a firm and <br /> unyielding mass using an excavator-mounted hoepack. Penetration depths encountered shortly after compaction were <br /> generally 2 inches using a 1/2 inch diameter soil probe. The lot area was not completely backfilled prior to our departure <br /> from the site today. <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project irrespective of the presence of our representative. Our work does not include supervision or direction of the contractor,the contractor's employees <br /> or agents. Our firm is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 • <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 <br />