Laserfiche WebLink
CEO DESIGN FIELD RE RJ <br /> v � <br /> Project Name: Everett River Front-Simpson Report: 064 <br /> GeoDesign#: Polygon-127-03 Date: 07/28/2017 <br /> Reports with Unresolved Nonconformance Issues: Permit: <br /> PW1505-005 <br /> Nick Abdelnour <br /> bdelnour(Polygon) Randy Allen(City of Everett) Weather: Clear,60-70's <br /> Ron Bowen(Polygon) l Eddy Stevens(Polygon) Arrival/Departure: 0945/1015 <br /> Distribution: <br /> Doug Ross(Polygon) i Kirk Keck(City of Everett) <br /> Paul McKee(City of Everett) 1 Dave Foster(City of Everett) Prepared By: Ben Weinberg, EIT <br /> m Site Plan(s) 0 Density Test Summary Signature: V <br /> Attachments: 0 Installation Records m Other Reviewed By: <br /> SUMMARY of OBSERVATIONS(CONTINUED): <br /> Previously GeoDesign noted that DDS had over-excavated the Lot 248 area approximately 4 feet down to firm and <br /> unyielding material and backfilled the lot area to approximately 2 feet below plan bottom of footing.Today,GeoDesign <br /> noted that BDZ had completed backfilling the lot are to near its plan bottom of footing using a cement-treated material.The <br /> material had been compacted into a firm and unyielding mass using a smooth-drum vibratory roller. Penetration depths <br /> encountered across the lot area were generally less than 2 inches using a 1/2 inch diameter soil probe. <br /> gga a , • s a •r�•�© `? fo rlddttr 6 la, sese1 foF <br /> :-TrlaDes• recommrshaiany oose an saturag`i CWT. ronitlf base <br /> of the footings prior to placement of concrete. <br /> A summary of our observations and density tests can be found in the attached Figure 1 and Photo Log. <br /> • <br /> This report presents opinions formed as a result of our observation of activities relating to geotechnical engineering or environmental services.We rely on the contractor to comply with the plans and <br /> specifications throughout the duration of the project Irrespective of the presence of our representative.Our work does not indude supervision or direction of the contractor,the contractor's employees <br /> or agents.Our firm Is not responsible for site safety.This field report is a DRAFT representation of our field observations,testing,and preliminary recommendations.The report can only be considered <br /> final upon review of the GeoDesign project manager,as indicated by initials in the"Reviewed By'section. <br /> 10700 Meridian Avenue North,Suite 402 I Seattle,WA 98133 I 206.838.9900 <br /> 2502 Jefferson Avenue I Tacoma,WA 98402 I 253.203.0095 ter <br /> ,, <br />