My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2115 55TH ST SE 2018-12-31
>
Address Records
>
55TH ST SE
>
2115
>
2115 55TH ST SE 2018-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/31/2018 3:22:36 PM
Creation date
12/31/2018 3:22:26 PM
Metadata
Fields
Template:
Address Document
Street Name
55TH ST SE
Street Number
2115
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPROVED <br /> PUBLIC WORKS DEPARTMENT Anstey Engineering <br /> t3Y 8627 NE 180th Street <br /> DATE 4 If--17 Bothell,WA 98011 <br /> CITY OF EVERETT REVIEWED FOR PERMIT Phone:206-303-7639 <br /> Fax:425-659-9203 <br /> E-mail:benanstey@ansteyengineering.com <br /> March 1,2017 <br /> Proposed Lot 1 New Residence for Richard Vaisvila <br /> Richard Vaisvila richardvaisvila@comcast.net <br /> Located near: 55th Street and Lowel Road Tax Parcel 00495800701003 <br /> Everett,WA <br /> Legal Description:LOT 1,CITY OF EVERETT SHORT PLAT NO. 1202-2007-045,RECORDING <br /> NUMBER 201503035001,RECORDS OF SNOHOMISH COUNTY,LOCATED IN CITY OF <br /> EVERETT,COUNTY OF SNOHOMISH. <br /> Targeted Drainage Review <br /> Section 1 Project Description/Overview <br /> The 11,098sf(0.255+/-acre) site is located on the north side of Lowel Road between the <br /> gravel alley and the Pacific Northwest Traction Company Right of Way(Substation). The <br /> site is currently vacant with some ivy,trees and brush. There is no storm drainage in the <br /> area. The site slopes down to the northeast at 20 to 40%+/-. Storm water runoff currently <br /> sheet flows off of the vacant site to the PNW Traction Company ROW, or infiltrates on <br /> site. See attached site map. The flow will continue to flow to the northeast as it now does <br /> but infiltration trenches will be installed to better infiltrate the flow from the driveway <br /> and houses. The driveway pavement will slope to a catch basin in the driveway and the <br /> catch basin will drain to a 21'x2'x2' infiltration trench. The house downspouts will drain <br /> to a 561f x 2' x 2' infiltration trench. <br /> The site is located on Parcel 00495800701003. The site address is to be determined <br /> This project will pave 2,226sf of existing brush and ivy with pavement or roofs The <br /> project proposes to construct a new 1,838sf Single Family Residence and a 699sf <br /> driveway. See site plan. <br /> Section 2 Site Assessment <br /> Per the City of Everett Storm Drainage Manual Figure 2.1, Requirements 1 through 5 will <br /> be met. <br /> Requirement#1—A storm water site plan will be provided-see attached. <br /> Requirement#2—A Site Pollution Prevention Plan is provided-see attached <br /> Requirement#3— Source control of pollutants will be provided by a downturned elbow in the driveway <br /> catch basin and the infiltration trench for the driveway runoff. <br /> Requirement#4— Preserve the Natural Drainage will be complied with as the runoff will continue to flow <br /> as it does now to the south. <br /> Requirement#5—Infiltrate,Retain or Disperse stormwater runoff to the extent feasible.A perforated pipe <br /> connection to the City Storm Drainage system is the best method for control of storm water for this site. <br /> The soils on the site are Alderwood series (5)per the SCS Soil Map but a soil <br /> investigation by Anstey Engineering found the soils to be medium sand, so the use of <br /> total infiltration for the disposal of storm runoff is practical. <br /> Soils Logged March 1, 2017 weather was cloudy <br /> Vek, <br /> AE2017-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.