Laserfiche WebLink
stream or river flowing from such lake, a copy of the nodce of hearing shall be publishcd at <br /> least once a week for two consecutive weeks before the time set for hearing in a newspaper in <br /> each county or coundes wherein located, said no6ce to contain a br'ef statement of the crasons <br /> and necessiry for such apPlicaaon. [1994 c 264 4 88; 1988 c 36 ¢ 67; 1987 c 109 $ 105; 1963 <br /> c 243 $ 1; 1959 c 258 § 2; 194�c 210 § 1; 1939 c 107 � 4; Rem. Supp. 1947 � 7388-3.] <br /> NOTES: <br /> Purpo�4hort ekle—Coortructbo—Ruka-3evenbWry—CapHom-19s7 c 109: See nota following <br /> � RCW 43.21B.00L <br /> RCW 90.24.040 Hearing on petition—Order—Contlnutn�jurisdictioo. <br /> At the hearing evidence shall be introduced in support of the petition and all intcrested pazties <br /> may be heard for or against it. The court shall make findings and conclusions and enter an <br /> order �ranting or refusing thepe tition, and if the peddon is granted, shall fix the water level to <br /> be mau�tained and direct the department of ecology to regulate and control the outflow of the <br /> lake so as to properly maintain the water level so far as pracdcable within mauimum and <br /> minimum flmits when the proQer control devices are installed: PROVIDED, That the court <br /> shall have continuing ju�isdic�on after a petidon is once granted and shall, upon subsequo�it <br /> peddon filed and heard in accordance with the precedinq secdons, make such further findin¢s <br /> and conclusions and enter such further orders as are necessary to accomplish fully the <br /> objectives sought in the inidal pedtion: AND PROVIDED F[JR'I'IiER, That shall the court <br /> find any such riparian owners abutting on a stream nr river flowing from such lake be <br /> adversely affected in any way by the granting of such a pe�dtion, such petidon shall be refused. <br /> [I985 c 398 � 29; 1959 c 258 � 3; 1939 c 107 § 5; RRS § 7388-4.] <br /> N07'FS: <br /> ERective date-1983 c 398: See note following RCW 90.24.010. <br /> RCW 90.24.050 Devices to proter.t the Rs6—Cost—Special fund. <br /> In the event the court shall 6nd that to protect fish and game fish in said lake that fish ladders <br /> or other devices should be consavcted therein or that other conswction shall be neressary in <br /> order w maintain the deternuned lake level, the court shall find the proper device to be <br /> constructed, the probable cost thereof and by its order and judgment shall apportion the cost <br /> thereof among the persons whose property abuu on said lake in proportion to the lineal feet of <br /> waterfront owned by each, which sum so found shall consdtute a Gen against said reai property <br /> and shall be paid to the counry treasurer and by him placed in a special fund to be lmown as <br /> "Lake . . . . . . Improvement Fund." The director of ecology sl�all appoint a suitable person <br /> to be compensated by the property owners to regulate the determined level as decreed by the <br /> court. [1988 c 127 § 82; 1939 c 107 § 6; RRS § 7388-S.j <br /> RCW 90.24.060 Installation of devices. <br /> Such improvement or device in said lake for the protection of the fish and game fish therein <br /> shall be installed by and under the direction of the board of county commissioners of said <br /> county with the approval of the respective directors of the department of fish and wildlife and <br /> the department of ecology of the state of Washington and paid for out of the special fund <br /> provided for in RCW 90.24.050. [1994 c 2Cr3 § 89; 1988 c 36 § 68; 198'7 c 109 § 106. <br /> Prior: 1939 c 107 § 7; RRS § 7388-6.] <br /> NOTES: <br /> Purpou�S6ort Htle—Con�tructloo—Ruln�rvera6ility_Captlon�-1987 c I09: See notes following <br /> Fi�W d3 218 001. <br /> 1894 RCW <br />