My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD 2019-01-11
>
Address Records
>
HARDESON RD
>
7301
>
7301 HARDESON RD 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 3:07:02 PM
Creation date
1/8/2019 10:42:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Spill prevention measures, such as drip pans, will be used when conducting <br /> maintenance and repair of vehicles or equipment. <br /> • In order to perform emergency repairs on site, temporary plastic will be <br /> placed beneath and, if raining, over the vehicle. <br /> • Contaminated surfaces shall be cleaned immediately following any discharge <br /> or spill incident. <br /> Chemical storage: <br /> • Any chemicals stored in the construction areas will conform to the appropriate <br /> source control BMPs listed in Volume IV of the Ecology stormwater manual. <br /> In Western WA, all chemicals shall have cover, containment, and protection <br /> provided on site, per BMP C153 for Material Delivery, Storage and <br /> Containment in SWMMWW 2012 <br /> • Application of agricultural chemicals, including fertilizers and pesticides, <br /> shall be conducted in a manner and at application rates that will not result in <br /> loss of chemical to stormwater runoff. Manufacturers' recommendations for <br /> application procedures and rates shall be followed. <br /> Excavation and tunneling spoils dewatering waste: <br /> • Dewatering BMPs and BMPs specific to the excavation and tunneling <br /> (including handling of contaminated soils) are discussed under Element 10. <br /> Demolition: <br /> • Dust released from demolished sidewalks,buildings, or structures will be <br /> controlled using Dust Control measures (BMP C 140). <br /> • Storm drain inlets vulnerable to stormwater discharge carrying dust, soil, or <br /> debris will be protected using Storm Drain Inlet Protection (BMP C220 as <br /> described above for Element 7). <br /> • Process water and slurry resulting from sawcutting and surfacing operations <br /> will be prevented from entering the waters of the State by implementing <br /> Sawcutting and Surfacing Pollution Prevention measures (BMP C152). <br /> Concrete and grout: <br /> • Process water and slurry resulting from concrete work will be prevented from <br /> entering the waters of the State by implementing Concrete Handling measures <br /> (BMP C151). <br /> UNDERWOOD GARTLAND JOHNSON 63,LLC April 2017 <br /> Stormwater Pollution Prevention Plan Page 7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.