Laserfiche WebLink
G17. DUTY TO COMPLY 42 <br /> G18. TOXIC POLLUTANTS 42 <br /> G19. PENALTIES FOR TAMPERING 43 <br /> G20. REPORTING PLANNED CHANGES 43 <br /> G21. REPORTING OTHER INFORMATION 43 <br /> G22. REPORTING ANTICIPATED NON-COMPLIANCE 43 <br /> G23. REQUESTS TO BE EXCLUDED FROM COVERAGE UNDER THE PERMIT 44 <br /> G24. APPEALS 44 <br /> G25. SEVERABILITY 44 <br /> G26. BYPASS PROHIBITED 44 <br /> APPENDIX A—DEFINITIONS 47 <br /> APPENDIX B—ACRONYMS 55 <br /> LIST OF TABLES <br /> Table 1: Summary of Required Submittals 4 <br /> Table 2: Summary of Required On-site Documentation 4 <br /> Table 3: Summary of Primary Monitoring Requirements 15 <br /> Table 4: Monitoring and Reporting Requirements 17 <br /> Table 5: Turbidity,Fine Sediment&Phosphorus Sampling and Limits for <br /> 303(d)-Listed Waters 25 <br /> Table 6: pH Sampling and Limits for 303(d)-Listed Waters 26 <br /> 111 Construction Storm water General Permit <br /> Page 3 <br />