Laserfiche WebLink
2. Transfer of Coverage Form <br /> The Permittee can transfer current coverage under this permit to one or more new <br /> operators, including operators of sites within a Common Plan of Development, <br /> provided the Permittee submits a Transfer of Coverage Form in accordance with <br /> General Condition G9. Transfers do not require public notice. <br /> B. Public Notice <br /> For new or previously unpermitted construction activities,the applicant must publish a <br /> public notice at least one time each week for two consecutive weeks, at least 7 days <br /> apart, in a newspaper with general circulation in the county where the construction is to <br /> take place. The notice must contain: <br /> 1. A statement that"The applicant is seeking coverage under the Washington State <br /> Department of Ecology's Construction Stormwater NPDES and State Waste <br /> Discharge General Permit". <br /> 2. The name, address and location of the construction site. <br /> 3. The name and address of the applicant. <br /> 4. The type of construction activity that will result in a discharge (for example, <br /> residential construction, commercial construction, etc.), and the number of acres to <br /> be disturbed. <br /> 5. The name of the receiving water(s) (that is, the surface water(s)to which the site <br /> will discharge), or, if the discharge is through a storm sewer system,the name of <br /> the operator of the system. <br /> 6. The statement: "Any persons desiring to present their views to the Washington <br /> State Department of Ecology regarding this application, or interested in Ecology's <br /> action on this application,may notify Ecology in writing no later than 30 days of <br /> the last date of publication of this notice. Ecology reviews public comments and <br /> considers whether discharges from this project would cause a measurable change in <br /> receiving water quality, and, if so,whether the project is necessary and in the <br /> overriding public interest according to Tier II antidegradation requirements under <br /> WAC 173-201A-320.Comments can be submitted to: Department of Ecology, <br /> PO Box 47696, Olympia, Washington 98504-7696 Attn: Water Quality Program, <br /> Construction Stormwater." <br /> Construction Stormwater General Permit <br /> Page 10 <br />