My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7301 HARDESON RD 2019-01-11
>
Address Records
>
HARDESON RD
>
7301
>
7301 HARDESON RD 2019-01-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2019 3:07:02 PM
Creation date
1/8/2019 10:42:26 AM
Metadata
Fields
Template:
Address Document
Street Name
HARDESON RD
Street Number
7301
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Turbidity/Transparency Sampling Requirements <br /> 1. Sampling Methods <br /> a. If construction activity involves the disturbance of 5 acres or more,the <br /> Permittee must conduct turbidity sampling per Special Condition S4.C. <br /> b. If construction activity involves 1 acre or more but fewer than 5 acres of soil <br /> disturbance,the Permittee must conduct either transparency sampling or <br /> turbidity sampling per Special Condition S4.C. <br /> 2. Sampling Frequency <br /> a. The Permittee must sample all discharge points at least once every calendar <br /> week when stormwater(or authorized non-stormwater) discharges from the site <br /> or enters any on-site surface waters of the state (for example, a creek running <br /> through a site); sampling is not required on sites that disturb less than an acre. <br /> b. Samples must be representative of the flow and characteristics of the discharge. <br /> c. Sampling is not required when there is no discharge during a calendar week. <br /> d. Sampling is not required outside of normal working hours or during unsafe <br /> conditions. <br /> e. If the Permittee is unable to sample during a monitoring period, the Permittee <br /> must include a brief explanation in the monthly Discharge Monitoring Report <br /> (DMR). <br /> f. Sampling is not required before construction activity begins. <br /> g. The Permittee may reduce the sampling frequency for temporarily stabilized, <br /> inactive sites to once every calendar month. <br /> 3. Sampling Locations <br /> a. Sampling is required at all points where stormwater associated with <br /> construction activity (or authorized non-stormwater) is discharged off site, <br /> including where it enters any on-site surface waters of the state (for example, a <br /> creek running through a site). <br /> b. The Permittee may discontinue sampling at discharge points that drain areas of <br /> the project that are fully stabilized to prevent erosion. <br /> c. The Permittee must identify all sampling point(s) on the SWPPP site map and <br /> clearly mark these points in the field with a flag, tape, stake or other visible <br /> marker. <br /> d. Sampling is not required for discharge that is sent directly to sanitary or <br /> combined sewer systems. <br /> Construction Storinwater General Permit <br /> Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.