Laserfiche WebLink
PUBLIC WORKS <br /> C-10 section regarding using the correct relationship between the low flow <br /> orifice,pond bottom, and higher orifice. <br /> o Show the horizontal and vertical setback standards for the infiltration basin. <br /> o Update notes as needed. <br /> o Show pipe length, diameter, and slope for discharge pipe from CB-15. See <br /> related comment on Sheet C-06. <br /> • Sheet C-10 <br /> o Detail— SDMH#3 Type 2 54"-Diam. <br /> ■ Provide low flow orifice elevation, and check all elevations used in <br /> WWHM model against the bottom elevation of the infiltration pond. <br /> 4. Please note that a separate review of the landscaping plans will be conducted by this project's <br /> Planning Reviewer with a comment letter issued separately, if needed. If you have any <br /> questions regarding the status of Planning's review or the comments themselves, please contact <br /> John Emerson with the City of Everett Planning Department (425-257-8737 or <br /> JJimerson@everettwa.gov). Revisions to the landscaping plans should be coordinated with civil <br /> revisions to ensure no conflicts, however they can be resubmitted separately. <br /> Page 9 of 9 / <br />