Laserfiche WebLink
A PORTION OF THE S 1/2 OF SECTION 1 &THE N 1/2 OF SECTION 12,T 28 N, R 4 E,WM <br /> • <br /> • INSTALL OVERSIZE CLAMP OR SLEEVE <br /> CONNECTION AT OUTFALL TO ALLOW 2-12"SD OUTFALLS WITH ROCK HEADWALL •11/////rr <br /> EXPANSION/CONTRACTION OF HDPE IE=427.00 I '4t <br /> W/SOU ID LOCKING54"O PIPESDMH ' TYPE RIPRAP SETTLING BASIN TO BE MINIMUM /�4,, / p <br /> 50 LF-18"®0.50% COVER 10'Lx8'W WITH A 1'DEEP DEPRESSION. <br /> &FLOW RESTRICTOR 0 INSTALL 8"-12"SIZE RIPRAP ROCK AT 2'DEEP. NJ O RT H <br /> ASSEMBLY <br /> EX: SDMH -18'SETBACK FROM <br /> TOP 435.50 <br /> TOP 432.73 PROPERTY UNE TO , <br /> IE 428.8 12"(E) IE 428.98-18"(E) MAX WATER SURFACE CONSTRUCTION NOTES: I � 1 <br /> IE 428.98-18"(SW) EX.SDMH <br /> IE 427.5 18'(N,S) 434.0 �99=(NW� 0 20 40 BO Z <br /> C.O.E STD DWGS 405, TOP 434.35 <br /> '15,416,&611 IE 429.5 12"(SE,W) O SEE DETAIL SHEET C-10 FOR FLOW RESTRICTOR SCALE: 1"=40' Q a <br /> II IX.OVERFLOW INLET - MANHOLE.CONNECT TOT PROPOSED SDMH�4 ON -I 7 <br /> lit---Ist_-._. } TOP 434.00 O EXISTING 18"STORM SEWER IN HARDESON ROAD. D- L <br /> -f I-SD- IE 429.9 12"PVC(NB) p �® 0-5•�� o_ Q o <br /> SDMH TYPE 2-46" IO CONSTRUCT SDMH OVER EXISTING 18"STORM •••1 <br /> p <br /> ............. -.... _.............._........................a_......__......................_......................�.. ... SEWER.RESTORE STREET PAVEMENT PER a: U CO <br /> ©5/SOLID LOCKING. COVER Or-II <br /> TOP 434.20 ( �• in O " C.O.E.STD DWGS 326&614. EL H i 2 <br /> IE 428.73 18"(N,S) 1 r F' "' C.O.C.STD DWC 105&611 J Q <br /> IE 428.73 18"(E) �' �1 �,� �p.S TIX'-435.00 O 20 FOOT WIDE MAINTENANCE ACCESS DRIVE. (n <br /> C.O.E.SW DWGS 405&611 �`"�i)e7�1 ���P' , iE-430.50 18"(NW,OE) 4"CSBC OVER 12"RECYCLED CONCRETE. Q Cr) <br /> 0 -�1i@irt,'1,i�� �� ra; Tr --Il� v,.,n„n«--,,,,;,r BASIN DESIGN BASIS W <br /> hat <br /> 'r� �-J ^u"„c O¢ INSTALL DOUBLE 20'WIDE CHAIN LINK SWING GATE O cp D <br /> 0 �t� �� 430 11 ON ACCESS DRIVE. THIS INFILTRATION BASIN IS DESIGNED BASED ON AN INFILTRATION RATE CO W <br /> 11iiij� t 427 ('' \ 1N�� CONSTRUCT 20 FOOT CONCRETE DRIVEWAY TYPE 1 OF 1.5 INCHES PER HOUR FOR 29.6 ACRES OF TYPE C FORESTED Z Q Z J <br /> I��• 1..... <br /> `� W/ROCK HEADWALL �+ VP �i �'•\��. 5-40.7OR © 'E -.•E u FD <br /> //�\\ CONDITION CONVERTED TO 80%IMPERVIOUS AND 20%LANDSCAPING. Q O m <br /> 33'SETBACK FROM &TRASH RACK O\ 100* <br /> 1 V.' �Q- Or^ <br /> PROPERTY LINE TO I 1 _ O \ �i'0 *� THE INFILTRATION BASIN WAS MODELED USING THE WESTERN u) <br /> ,c INSTALL CATCH BASIN TYPE 2-48"ON EXISTING (J o <br /> 4MAX 34.0 WATER SURFACE I O� PT © INFILTRATION SB p ��� \\ '�,' • O 12"STORM SEWER AS SECONDARY OVERFLOW. WASHINGTON HYDROLOGY MODEL(WWHM2012). O Z <br /> I , O P /14010°',1, CB S-TYPE 248'0 INSTALL DEBRIS CAGE PER DETAIL ON SHEET C-10. Z m <br /> BASIN (230'X 55') + S /\<Z- Ai �'�, W/ROUND SOLID LOCKING COVER O (n 2 <br /> +�///���./��A .r,, •. ,• RIM ELEVATION=434.00. X <br /> 0 <br /> I 427 �, yj !'` �l C.O.E.STD DWG 405&611 EXISTING IE(12")=429.9(NW) m <br /> �_1�' \,�IG�e�1i�1►I�i1�I��%� roP_4s1so m <br /> 11(:1) ) <br /> C G 1 r �` 430 w 4�,. '� ♦'�I�,>/r•'\ IE-469.86-18"(W) Oj SDMH r• G^ CTIr� BY r 2 •,r r•E z W� <br /> ER.B'SS 40%*I J ���"'�,•��,�/,�,,���,��� IE=478.02-12(SW) DEVELOPMENT.FUTURE DEVELOPMENT TO PROVIDE 0 0 EL <br /> � ��i ��1s 3 440�f��w��G►_��'tC��►�G�����i!� 0.4100��i%��5���'���:� iE 46938-iz"NNV S) <br /> INDIVIDUAL CONNECTION. STANDARD <br /> QUALITY FACILITIES PRIOR TO STANDARD PRACTICE CODING SYSTEM < z <br /> I 4104:3,401-1:01-1"4-111 <br /> .• i••.j*�. i- -�.i-� ...0.,5�,,tot�S x.'0.41 � .0.,,,:.,A• IE=469.36-12•(NW) O$ HYDROSEED ALL EXPOSED SOILS.PER LANDSCAPE CONTRACTOR TO INSTALL AND MAINTAIN ALL EROSION CONTROL BMP$ J D <br /> 'I �.�/���. .�-.�•��'��'.��'_��.�� ' 1.0.-.1000. PLANS.INSTALL EROSION CONTROL MAT,NORTH AS SHOWN ON THIS PLAN IN ACCORDANCE WITH DEPARTMENT OF <br /> �,,..•51, 110,114.10301.1", <br /> }1' �- �- r ��T�. ��}p-��► ��}►"`���\\\ �, AMERICAN GREEN SC750. ECOLOGY STORMWATER POLLUTION PREVENTION REQUIREMENTS Li <br /> a. ��••�� 11107 X4•1.'11•�••�•�-• ,4 01,101.3151INSTALL 6 FT HIGH PERIMETER CHAINUNK FENCE. <br /> .�� - -.- '- .a -_ po -r __ `,S',� \ � O SUMMARIZED ON SHEET C4. IF BMP INSTALLATION AND MAINTENANCE IS Z <br /> pp ., .„„,,..*-41.- . :`�.�'.}-,.,L.��.}...,-.. I.� v I��►�. INADEQUATE O MEET THESE REQUIREMENTS CONTRACTOR IN PROVIDE <br /> pil <br /> /'jl'�� `i♦ }�``-�' r �- }� ��}�.- _."}1� ��,.�}�}�, �� .���� FUTURE LOT 3 ADDITIONAL RAP'S AT NO ADDITIONAL COST TO OWNER. <br /> V�cworp ��ip��aorigie IImolk� .�•�•`\X•1,�.�;� STORM DRAIN 10 FENCING TO BE INSTALLED BY CADMAN <br /> •n♦ �ra} f-}�- }r}� }r a wtreiaaikoyis�scos 'ss ` CODE BMPs '� <br /> EX. SDMH ��� ��� ��� �����I���LfS�.��G�l �� ♦' \�� <br /> �� r �. ��:- ��- �� �.�..p>;���.�".� it CONSTRUCT TWO f IPE ANCHORS PER DETAIL ON Q' '��1: <br /> r• 4:. ` ASSOKin ,a&sin����Lia��maiorm 10404,*.\ SHEET C 10. O . <br /> IE 433.6 18"N Q I `:�..�-'.. -'..�' _1.''..' .3.S-..A= =•� • II i INSTALL ANVIL SOCKET CLAMP PIPE ANCHORS WITH 5'LONG STEEL CORDEN RODS(OR CL CLEARING LIMITS&HIGH VISIBILITY FENCE(D.O.E.BMP C103) <br /> ,2-.-‘11!"'-. <br /> ‘ ` <br /> APPROVED EQUAL ON 12"HDPE PIPE AT LOCATIONS SHOWN-CLAMPS TO BE ONE SIZE <br /> ���►►�uL /�� ����f'.7I�I\tMf�����_ _ _ syn <br /> �__•�__ i l LARGER THAN PIPE TO ALLOW EXPANSION/CONTRACTION. Y �_-3 <br /> 1 i'j HARDESON INFILTRATION BASIN/SWPPP NOTES: Dc DUST CONTROL(D.O.E.BMP c14o> <br /> • -• 1. INFILTRATION BASIN TO BE USED AS TEMPORARY SEDIMENT POND. LOT 1 TO BE <br /> Z I ®® „ I I CD INTERCEPTOR SWALE W/ROCK CHECK DAM(D.O.E.BMP C200) <br /> x 1 / STABILIZED PRIOR TO OVER-EXCAVATING POND AND PLACEMENT OF SAND LAYER. <br /> FENCING TO BE INSTALLED �� '` <br /> (n BY UNDERWOOD GARTLAND ( 1 '.•.( 2. CONTRACTOR TO OVER-EXCAVATE A MINIMUM OF 5 FEET BELOW THE BASIN <br /> 410 <br /> lull) <br /> I INSTALL 2-12"DIAMETER HDPE I �✓ <Z BOTTOM AND REPLACE WITH 5 FEET OF WASHED CEMEX SAND.THE POND IP CATCH BASIN/INLET SEDIMENT PROTECTION <br /> /• 0 INSTALL <br /> 2-12 PIPES 160LF EA) ( 'Si"- BOTTOM SHALL BE EVALUATED DURING CONSTRUCTION BY THE ENGINEER TO (WSDOT STD PLAN 1-40.20-00 Sc D.O.E.BMP C220) <br /> I ( p ( I / DETERMINE IF ADDITIONAL EXCAVATION IS REQUIRED TO REMOVE ALL EXISTING <br /> Q I k +ON THE GROUND SURFACE 1 O� FILL MATERIAL. MU MULCH(D.O.E.BMP C121) <br /> = i • 1 /\ S n WITH PIPE ANCHORS. <br /> ! O !!cb SLOPE TO MATCH POND SLOPE I I 3. PERMANENT SLOPES ADJACENT TO THE POND SHALL BE CUT INTO THE DENSE Z N <br /> r�'J G3 (2:1 MAX). NATIVE SOILS TO THE SOUTH AT 2H:1V FOR PERMANENT SLOPES AS SHOWN.ANY PS TEMPORARY&PERMANENT SEEDING D.O.E.( BMP 0120) y ;? <br /> I PERMANENT SLOPES THAT ARE CUT INTO EXISTING FILL THAT WAS NOT O - <br /> I • ; hC'' P PREVIOUSLY COMPACTED TO ENGINEERED STANDARDS SHALL BE REMOVED, rn m <br /> PREPARED AND COMPACTED IN ACCORDANCE WITH THE SLOPE RECONSTRUCTION O Z W rn v <br /> a' �\ i DETAIL SB SEDIMENT BASIN/TRAP(D.O.E.BMP C241) Q h <br /> �Q' POND GRADING TO BE " >Q p 3 n <br /> COORDINATED WITH MINING c <br /> Jf ^ RECLAMATION I SF TEMPORARY SILT FENCE(D.O.E.BMP C233) W U >H a <br /> • + I „ ;y c c <br /> QU) M2,,>a <br /> 4D � 3W <br /> Q 6 m <br /> 550 550 EROSION CONTROL MONITORING PLAN 0 <br /> 540 --- 540 1. OBSERVE EROSION CONTROL MEASURES AT THE BEGINNING AND END <br /> -- OF EACH DAY.REPAIR AND OR REPLACE AS NECESSARY TO ASSURE <br /> _--._ - PROPER FUNCTION. <br /> T .... �.� REVISIONS: APPD. <br /> Id 530 _.. ,... _ _ _.. _.. 530 2. OBSERVE COLLECTION FACILITIES DURING PERIODS OF HEAVY9-20-17 MN <br /> RAINFALL AND WET WEATHER CONDITIONS. <br /> 520 / 520 3. OBSERVE AND MONITOR STABILIZATION TECHNIQUES.MAKE REPAIRS <br /> m EXISTING GRADE\ - - - :: AND/OR ALTERATIONS AS NECESSARY TO PREVENT EROSION. <br /> 4 510- _... i, ... _ 510. - <br /> 4. COMPLY WITH ALL WASHINGTON STATE DEPARTMENT OF ECOLOGY <br /> w .._ .. _ __ .i ... _.. _. (D.O.E.) AND CITY OF EVERETT(C.O.O.)REQUIREMENTS FOR - <br /> -- - - - - - - - - -- i <br /> / ... - DISCHARGE OF STORMWATER. <br /> T, <br /> 500 __... _.... POND GRADING TO BE _._ 500 <br /> COORDINATED WITH MINING <br /> 490 490 RECLAMATION ki SWPPP BEST MANAGEMENT PRACTICES <br /> PAD ELEV=484.0 <br /> o - ,' 1�: THE LOCATION AND TYPE OF PROPOSED MEASURES FOR TEMPORARY EROSION DATE: SEPTEMBER,2017 <br /> 0 480 f _.._._ 480 CONTROL SHALL BE AS FOLLOWS: DESIGN: JNM <br /> 470 - - - - - - / - - - - SEDIMENT BASIN --DETENTION POND TO BE UTILIZED AS DRAWN: CD <br /> 8 - - -- / - - - TEMPORARY SEDIMENT BASIN CHECKED: <br /> / 470 <br /> $ - - - MULCH AND HYDROSEED--ALL EXPOSED SOIL UPON ATTAINMENT OF FINISH REVISION <br /> X / - GRADE NUMBER: <br /> P. 460 / 460 SILT FENCES --AT DOWNSLOPE SIDE OF AREAS TO BE CLEARED <br /> _ ... .... ..... .... ... ....... <br /> P. AND AT TOE OF FILL SLOPES <br /> 6 z 6'WIDE BERM _ SCALE: <br /> LT_ 450 - 1OP=435.0 450 WET WEATHER GRADING&SWPPP NOTE PROJECT NUMBER: <br /> .2 W FINISHED GRADE iV - _ 1. FROM OCTOBER 1 TO APRIL 30,NO DENUDED.SOIL AREAS AND SOIL STOCKPILES <br /> w 440 O 2 i 11 _ 440 MAY REMAIN EXPOSED FOR MORE THAN 2 DAYS AND NO MORE THAN 7 DAYS UGDX0003 <br /> C`:, <br /> r'>• m _ - -434.00 / - - - FROM MAY 1 TO SEPTEMBER 30. <br /> mm• _____ -- -- 3 :. : : DRAWING FILE: <br /> 430 �`�� 1 ',.1,/ 430 EC-009-IB-UGDX0003JEDEx.dwg <br /> .iER1 /ter <br /> 8.V 420 : L ' _ _.. 420 <br /> ^A BOTTOM OF INFILTRATION BASIN 5 FT DEPTH CLEAN - - - SHEET NO. <br /> fo CALL 410 I ELEVATION=427.0 -PIT SAND - - - I I1 I I I r I 410 REVISION 10-12-17 AA <br /> mw 2 BUSINESS DAYSC_09 O V <br /> BEFORE YOU DIG 0+00 1+00 2+00 3+00 3+70 <br /> to FOR UTILITY LOCATE SECTION A-A: HARDESON INFILTRATION BASIN BRETT NICHOLSON (DEA) OF12 <br /> " 1-800-424-5555 <br /> a g 1"=20'HORIZONTAL&VERTICAL f �.i'""'�"j/,/ <br /> 'A ' <br />