Laserfiche WebLink
• <br /> • <br /> 643-013-02 Dae Exported 08/31/18 <br /> 70 <br /> •Pre-Soak Head <br /> 60 — <br /> •Testing Head <br /> • <br /> • • <br /> • • <br /> 50 —._..._.•• <br /> •••••••• •••N••• ••• <br /> 40 _. ---- -- -_-.----- • <br /> GC <br /> :4 30 <br /> 20 <br /> 1.0 <br /> 0 <br /> 0 10 20 30 40 50 60 70 30 90 <br /> Stage# <br /> Notes: <br /> 1. The pre-soak period is intended to saturate the soil and is not taken to be the long-term PIT-2 Infiltration Rates <br /> infiltration rate. __ <br /> 2. The estimated field measured infiltration rate is 42.1 inches per hour. Cadman Infiltration Evaluation <br /> Everett,Washington <br /> GEOENGINEERS , Figure4 <br />