Laserfiche WebLink
643-01.3-02 Date Exported:08/31/18 <br /> 4 <br /> 3.5 •Pre-Soak Head — <br /> •Testing Head <br /> 3 <br /> • <br /> t <br /> 2.5 <br /> c <br /> C <br /> z 2 <br /> • <br /> 1.5 • • <br /> • <br /> • • <br /> 1 <br /> 0.5 <br /> 0 <br /> 0 1 2 3 4 5 6 7 8 <br /> Stage# <br /> Notes: <br /> 1. The pre-soak period is intended to saturate the soil and is not taken to be the long-term PIT-3 Infiltration Rates <br /> infiltration rate. —. --. <br /> 2. The estimated field measured infiltration rate is 1.1 inches per hour. Cadman Infiltration Evaluation <br /> Everett,Washington <br /> GEOENGINEERS Figure 6 <br />