My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GeoTest Services Inc 12/26/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
GeoTest Services Inc 12/26/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2019 11:09:55 AM
Creation date
1/8/2019 11:09:47 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
GeoTest Services Inc
Approval Date
12/26/2018
End Date
12/31/2019
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
Material Testing and Inspection Evergreen Lib
Tracking Number
0001569
Total Compensation
$18,460.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> The purpose of this contract is to provide professional material testing and inspection services for the Evergreen <br /> Branch Library Expansion Project located at 9512 Evergreen Way, Everett, WA 98204. <br /> The scope of services for this project are to provide material testing and inspection services as follows: <br /> 1. EARTHWORK: <br /> Periodic inspection during preparation of building and pavement subgrades. <br /> Perform field in-place density tests for stormdrain, fire service line, detention system and other utilities backfill. <br /> Perform laboratory sieve/proctors as needed. <br /> a. Test/Inspection: <br /> Item Visits Hours Per Visit No. of Tests <br /> Density Testing/Observation 8 4 <br /> Sample Pick-Up and Processing 2 2 <br /> Lab: Sieve/Proctor 4 <br /> Lab: Sand Equivalent 2 <br /> Lab: Percent Fracture 2 <br /> 2. CONCRETE: <br /> Periodic Inspection of reinforcing steel placement,anchor bolt placement,and formwork. <br /> Continuous inspection during placement, including sampling,slump,air,temperature and taking concrete specimens. <br /> Test concrete for compressive strength. <br /> a.Test/Inspection Item: <br /> Item Visits Hours Per Visit No. of Tests <br /> Foundations 3 4 <br /> Stem Walls and Plinths 1 4 <br /> Slab-On-Grade 2 8 <br /> Misc. Pours 2 4 <br /> Separate Rebar Inspections 2 4 <br /> Sample Pickup and Processing 8 1 <br /> Concrete Compression Tests 8 Sets x Sea. 40 <br /> 3. LATERAL FRAMING: <br /> Periodic inspection of SFRS shearwall and diaphragm nailing(less than or equal to 4" O.C). <br /> Periodic inspection of SFRS drag struts,braces,and connectors. <br /> a Test/Inspection: <br /> Item Visits Hours Per Visit No. of Tests <br /> Wood Framing inspections(SFRS) 8 4 <br /> 4. MASONRY: <br /> Periodic Inspection of reinforcing steel,and CMU placement at trash enclosure. <br /> Continuous inspection during grout placement. <br /> Sample and test compressive strength of grout and prisms. <br /> a. Test/Inspection: <br /> Item Visits Hours Per Visit No. of Tests <br /> Inspection 2 4 <br /> Sample Pickup and Processing 1 1 <br /> Grout Compression Tests 4 <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated July 23,2018) <br />
The URL can be used to link to this page
Your browser does not support the video tag.