Laserfiche WebLink
EXHIBIT B-1 <br /> CAI.iiAt G-1 <br /> Subconsultant Fee Determination - Summary Sheet <br /> (Mandatory when Subconsultants are utilized) <br /> Project: Everett UP No. 3691 - Sewer Utility Project "0" <br /> Sub Consultant: Krazan and Associates, Inc. - Proposal No. G18930WAL <br /> Direct Salary Cost (DSC): <br /> Classification Man Hours Rate Cost <br /> Senior Geotechnical Engineer 4 x $42.79 = $ 171.16 <br /> Project Engineer/Geologist 98 x $25.67 = $ 2,515.66 <br /> Drafting 11 x $25.67 = $ 282.37 <br /> Total DSC = $ 2,969.19 <br /> Overhead (OH Cost-- including Salary Additives): <br /> OH Rate x DSC of 162.13% x $ 2,969.19 = $ 4,813.95 <br /> Fixed Fee (FF): <br /> FF Rate x DSC of 30.00% x $ 2,969.19 = $ 890.76 <br /> Reimbursables: <br /> Itemized <br /> Laboratory Services = $ 2,100.00 <br /> Traffic Control Plan and Flaggers(cost+ 5%) = $ 7,850.00 <br /> Private Utility Locate(cost+ 5%) = $ - <br /> Drill Rig &Concrete Coring (cost+ 5%) = $ 14,300.00 <br /> Total reimbursables = $ 24,250.00 <br /> SubConsultants Total: _ $8,673.89 <br /> Contingency = $ 5,000.00 <br /> Grand Total $ 37,923.89 <br /> Prepared By: Jeffrey League, LG Date: 11/28/2018 <br /> DOT Form 140-089 EF Exhibit G-1 <br /> Revised 01-09 <br />