My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5813 HIGHWAY PL 2019-01-08
>
Address Records
>
HIGHWAY PL
>
5813
>
5813 HIGHWAY PL 2019-01-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2019 11:30:22 AM
Creation date
1/8/2019 11:30:18 AM
Metadata
Fields
Template:
Address Document
Street Name
HIGHWAY PL
Street Number
5813
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4-44705 -Przt/ - <br /> BLOWER DOOR TEST .1/1°'44hIAY <br /> House address or lot#: ' 3 kit.. i Evre,,, i <br /> Conditioned Floor Area: --- / - <br /> Duct tester location: N/A <br /> Pressure tap location: N/A <br /> Ring(if applicable):--oi:Te-n-E-1--------rg 2 0 3 0 <br /> At Rough-in or Post Construction <br /> allir - <br /> IIIIIIIIIIIIIII aummill Gill . Mb <br /> ) —I. <br /> ammommisa 11111 <br /> isimmimmummi <br /> - - <br /> . ... <br /> Air Leakage testing Calculator(Blower Door Test) <br /> Conditioned Floor Area: ii/75- ' Calculated Volume(cubic feet) <br /> 4°' <br /> ._ i <br /> Ceiling Hieght(ft) /4 5.5D <br /> Standard Calculated Test <br /> Tested CFM50 - <br /> Result(ACH50) <br /> _...5.0 ACH50 (cFm,ox -70? x G,C), --- Li 2 ) Tc) <br /> 60÷conditioned Volume) (-1 2/ id 7 )c)S' 30 <br /> • X Passed <br /> Glossary - - ,,____Failed <br /> Rough-ln: After installation of the complete air distribution system but before installation of insulation and <br /> sheet rock.:-Allo.ws for access to all duct seams and connections for re-evaluation of seal integrity if standard <br /> is not met in intitial test. <br /> Post Construction: At or near final inspection. The home must be complete enough to pressurize the home <br /> to 25 pa. .._ <br /> Total Leakage: Aggregation of the entire systems duct leakage in a duct test. <br /> Leakage to Exterior: Aggregation of all duct system leaks to the exterior of the CFA in a duct test. <br /> Pascal(pa): Unit of pressure . . - <br /> CFA: Conditioned floor area-in'tquare feet - <br /> I.R Drywall Systems, Inc. <br /> CFM25: Cubic feet per minute of air leakage at 25 pascals of pressure 7417 W Bostian Road <br /> CFM50: Cubic feet per minute of air leakage at 50 pascals of pressure Woodinville,WA 98072 <br /> 425-481-8485 <br /> Conditioned Volume: Volume-of conditioned space(CFA X ceiling hieght) LRDrywaii.c-orn <br /> AU-I50: Air changes per hour at 50 pascals of pressure <br /> Termaine7tiLz <br /> 1 <br /> r, l I -1 i ie <br /> I \\ IAN - 5 221,i3 ri),) <br /> L.„.„ .. <br /> , 4.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.