My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Washington State Military Department 11/20/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
Washington State Military Department 11/20/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2019 11:48:14 AM
Creation date
1/8/2019 11:47:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Washington State Military Department
Approval Date
11/20/2018
Council Approval Date
7/3/2018
End Date
8/31/2019
Department
Fire
Department Project Manager
Brent Stainer
Subject / Project Title
Support for Emergency Management Budget
Tracking Number
0001574
Total Compensation
$61,613.00
Contract Type
Agreement
Contract Subtype
Grant
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subaward, for which a contract, Subrecipient grant agreement, or other means <br /> of legal transfer of ownership is in place. <br /> ii. All equipment, and supplies as applicable, purchased under this Agreement will <br /> be recorded and maintained in the Subrecipient's inventory system. <br /> iii. Inventory system records shall include: <br /> A. description of the property <br /> B. manufacturer's serial number, model number, or other identification <br /> number <br /> C. funding source for the equipment, including the Federal Award <br /> Identification Number (FAIN) <br /> D. Catalog of Federal Domestic Assistance (CFDA) number <br /> E. who holds the title <br /> F. acquisition date <br /> G. cost of the equipment and the percentage of federal participation in the cost <br /> H. location, use, and condition of the equipment at the date the information <br /> was reported <br /> I. disposition data including the date of disposal and sale price of the <br /> property. <br /> iv. The Subrecipient shall take a physical inventory of the equipment, and supplies <br /> as applicable, and reconcile the results with the property records at least once <br /> every two years. Any differences between quantities determined by the physical <br /> inspection and those shown in the records shall be investigated by the <br /> Subrecipient to determine the cause of the difference. The Subrecipient shall, in <br /> connection with the inventory, verify the existence, current utilization, and <br /> continued need for the equipment. <br /> v. The Subrecipient shall be responsible for any and all operational and <br /> maintenance expenses and for the safe operation of their equipment and supplies <br /> including all questions of liability. The Subrecipient shall develop appropriate <br /> maintenance schedules and procedures to ensure the equipment, and supplies <br /> as applicable, are well maintained and kept in good operating condition. <br /> vi. The Subrecipient shall develop a control system to ensure adequate safeguards <br /> to prevent loss, damage, and theft of the property. Any loss, damage, or theft <br /> shall be investigated, and a report generated and sent to the Department. <br /> vii. The Subrecipient must obtain and maintain all necessary certifications and <br /> licenses for the equipment. <br /> viii. If the Subrecipient is authorized or required to sell the property, proper sales <br /> procedures must be established and followed to ensure the highest possible <br /> return. For disposition, if upon termination or at the Grant Agreement End Date, <br /> when original or replacement supplies or equipment acquired under a federal <br /> award are no longer needed for the original project or program or for other <br /> activities currently or previously supported by a federal awarding agency, the <br /> Subrecipient must comply with the following procedures: <br /> A. For Supplies: If there is a residual inventory of unused supplies exceeding <br /> $5,000 in total aggregate value upon termination or completion of the <br /> project or program and the supplies are not needed for any other federal <br /> award, the Subrecipient must retain the supplies for use on other activities <br /> or sell them, but must, in either case, compensate the federal government <br /> for its share. The amount of compensation must be computed in the same <br /> manner as for equipment. <br /> DHS-FEMA-EMPG-FY 18 Page 5 of 36 «Jurisdiction» OEM, E19-125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.