Laserfiche WebLink
INSPECTION REPORT <br /> � <br /> /Av .m Date/2/2 /(7 Permit: C��/ —O25 <br /> Contractor: j� <br /> Owner: Pae--/2/:‘,. '' - <br /> Site Address:_ 5.--8 2 7 __,,th', ./eg _ ,/ <br /> •F INSPECTION REQUESTED <br /> ELECTRICALILDMECHANICAL PLUMBING <br /> ❑Temp Service • I I ER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains DU Ceilin Grid ❑Refrigeration ❑Rough in <br /> ❑Roofical FirAlige ding Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR NSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS ' -',d <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED �,a t <br /> ❑ OK FOR C.O. ❑ VIOLATION 'F <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required 00 <br /> t) <br /> f, <br /> F: <br /> Inspector: , _N¢ <br /> y Date: —47�-t -1/ <br /> EIR(10/06) ..., ;"^"F DATABAR,INC. <br />