Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 10/30/2018 16:51 <br /> Issued By EAL ERICKSON,ANDREW L. <br /> Issued Department PW PUBLIC WORKS <br /> Date Issued 10/2/2018 <br /> Fund 401 Account 5 Program Function Activity <br /> Program UT3473 16 3 <br /> Title CONVERT.75 INCH 3615 SHORE AVE UT3473-16-3 <br /> Work Order No 20182394 Project Activity Type CORRECTIVE MAINTENANCE Status CL <br /> Status 10/2/2018 Time 08:52 Original WO Billing <br /> Problem Details <br /> CONVERT.75 INCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTyp Activity Compl Date Comments <br /> WS3494U024 WASRVC YES 10/3/2018 <br /> Address 3615 SHORE AVE <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference 3615 SHORE AVE <br /> Location <br /> Material Costs Billing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000347 ADAPTER 3/4 FCF X 3/4 IPS INSTA-TITE FEMALE COPPER FLARE 1 16.254 10/05/2018 PM <br /> M ADAP34000647 ADAPTER 3/4 FIP X 3/4 IPS INSTA-TITE 1 15.149 10/05/2018 PAP <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 2 30.554 10/05/2018 PAP <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 75.324 10/05/2018 PM <br /> M COUP34142747 COUPLING 3/4 CTS COMPRESSION X 3/4 MIP.871-.879 1 11.78 10/05/2018 PAP <br /> M COUP34003947 COUPLING 3/4 FEM COP SWL THD X 3/4 FLR COP 1/4 BEND ELBOW 1 20.266 10/05/2018 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 1 3.835 10/05/2018 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 194.458 10/05/2018 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .954 10/05/2018 PAP <br /> M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO 1 100.935 10/05/2018 PAP <br /> Total Material Cost $469.5 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 6.405 10/05/2018 <br /> NA N/A TOPSOIL .13 3.851 10/05/2018 <br /> NA N/A TRACING WIRE 3 .6 10/05/2018 <br /> NA N/A WIRE CLAMP 1 1.58 10/05/2018 <br /> Total NA Cost $12.44 <br /> Total Cost $481.95 <br />