Laserfiche WebLink
INSPECTION REPORT <br />Date ( ! W II % Permit: C 1169 d 3" 6 3(p <br />Contractor: <br />1 Owner: <br />Site Address: <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL <br />BUILDING <br />MECHANICAL <br />PLUMBING <br />❑ Temp Service <br />❑ LIFER ground <br />❑ Groundwork/Slab <br />❑ Groundwork/Slab <br />❑ Groundwork <br />❑ Footing <br />❑ Rough InRough <br />In <br />❑Slab/Conduit <br />❑ Foundation <br />❑ Ceiling Grid <br />❑ Ceiling Grid <br />Rough In <br />❑ Structural Slab <br />❑ OK to insulate <br />❑ OK to insulate <br />❑ Service <br />❑ Framing <br />❑ Rooftop Units <br />❑ Water Service <br />❑ Grounding <br />❑ Insulation <br />❑ Mechanical Final <br />❑ Medical Gas <br />❑ Ceiling Grid <br />❑ Drywall Nailing <br />❑ Plumbing Final <br />❑ Electrical Final <br />❑ Shear Nailing <br />GAS PIPE <br />SITE WORK <br />❑ Roof Nailing <br />❑ Rough In/Service <br />Hot Water Tank <br />❑ Footing drains <br />❑ Ceiling Grid <br />❑ Refrigeration <br />❑ Rough in <br />❑ Roof drains <br />❑ Building Finale <br />❑ Gas Pipe Final <br />❑ HWT Final <br />OTHER OR CONSULTATION: G. <br />2 2 72-7 <br />PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br />OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br />OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: <br />❑ CALL (425) 257-8881 FOR REINSPECTION — 24 hour notice required <br />Inspector: / Date; 7- <br />EIR (10/06) D ABAR, INC. <br />