My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3409 31ST DR 2019-01-09
>
Address Records
>
31ST DR
>
3409
>
3409 31ST DR 2019-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 8:19:15 AM
Creation date
1/9/2019 8:19:12 AM
Metadata
Fields
Template:
Address Document
Street Name
31ST DR
Street Number
3409
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date: 3/24/2017 <br /> Public Works Permit#: PW1703-055 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: C1603-040 <br /> Everett, WA 98201 Planning Reference#: SUB14-006 <br /> (425) 257-8810 <br /> Public Works Fee$: $ 416.00 <br /> Other$: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC PNW Riverfront LLC <br /> 11624 SE 5TH ST 11624 SE 5th Street#200 <br /> BELLEVUE WA 98005 BELLEVUE WA 98005 <br /> PHONE: PHONE: 4255867700 <br /> TAX PARCEL ID# SITE ADDRESS: 3409 31ST DR LOT162 <br /> SITE WORK FOR NEW TOWNHOME/TRAFFIC MITIGATION <br /> THIS PERMIT COVERS SITE WORK FOR THIS TOWNHOME. <br /> THIS PERMIT COVERS TRAFFIC MITIGATION FOR THIS UNIT <br /> LOT 162 PLAT OF THE TOWNS AT RIVERFRONT <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Site work to be done per approved site plan. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior w <br /> to starting construction and with public works inspection requests. <br /> 6. Subsurface foundation preparation shall adhere to the GeoDesign geotechnical report [tel <br /> which will include mat foundations, mat foundations with trenches and mat foundations <br /> with additional exploration needed. <br /> 7. Structural fill, testing, proof rolling for each foundation shall be done per the <br /> Geotechnical Report. The applicant will provide special inspection and reports for these <br /> issues and others to insure compliance with the Report and applicable building codes. <br /> 8. The applicant must request applicable City of Everett inspections for any of the <br /> under-slab utilities installed in conjunction with the foundations. 'Z <br /> 9. Install erosion control measures as determined by the Public Works Inspector, such <br /> as silt fence, straw bales, swales, or erosion blankets. (� � <br /> L . <br /> 10. Flexible connection for utilities are required as indicated in the GeoDesign J E.,l <br /> geotechnical report. <br /> 11. Driveways from the street to Garage shall be paved. APR 2 7 2017 e0), <br /> Public Works Permit Fee Breakdown: <br /> PW Plan Review $20.00 <br /> PW Site Inspection $20.00TO CITY OF EVERETT <br /> Drivewa $25.00 POSTING -°"'.. Permit Services <br /> Tratigation $351.00 ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> 7:= �` �� O V 5 causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> •p -d for Cons"m'ion D.-te remove same upon notice from the City and to replace public property <br /> damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.