Laserfiche WebLink
INSPECTION REPORT <br /> Date illy�a (fid Permit: &e't"agtp <br /> d <br /> Irk, <br /> Contractor: pz ll <br /> -/S \--.-\-77--- <br /> Owner: / <br /> Site Address: _ ?j" IST Z_ ,;_4? -g__V-_;%127 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ]Rooftop Units ❑Water Service <br /> ❑Grounding ) Insulation Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid '� Drywall Nailing i ❑Plumbing Final <br /> ❑Electrical Final hear Nailing 4 aeNT GAS PIPE <br /> SITE WORK Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 2. �� 11L , , <br /> ik\teV <br /> Inspector: ,e° <br /> Date: ` Y <br /> EIR(10/06) - DATABAR,INC. <br />