My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3009 34TH PL 2019-01-09
>
Address Records
>
34TH PL
>
3009
>
3009 34TH PL 2019-01-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2019 9:40:43 AM
Creation date
1/9/2019 9:40:39 AM
Metadata
Fields
Template:
Address Document
Street Name
34TH PL
Street Number
3009
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBL WORKS PERMIT Date Applied: 6/520?, JUN 2017 <br /> City of ett Public Works Department Works Permit#: PW1706-040 <br /> 3200 Cedar Street <br /> Parent Permit#: C1606-098 <br /> Everett,WA 98201 Planning Reference#: SUB14-006 <br /> (425)257-8810 Public Works Fee: $65 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> POLYGON WLH LLC PNW Riverfront LLC <br /> 11624 SE 5TH ST 11624 SE 5th Street#200 <br /> BELLEVUE, WA, 98005 BELLEVUE, WA, 98005 <br /> PHONE: PHONE: 4255867700 <br /> TAX PARCEL ID#: SITE ADDRESS: 3009 34TH PL LOT 13 <br /> DESCRIPTION: SITE WORK FOR NEW TOWNHOME <br /> THIS PERMIT COVERS SITE WORK FOR THIS TOWNHOME INCLUDING SEWER, WATER, DRAINAGE AND <br /> DRIVEWAY. <br /> LOT 13 PLAT OF THE TOWNS AT RIVERFRONT <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. Site work to be done per approved site plan. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction and with <br /> public works inspection requests. <br /> 6. Subsurface foundation preparation shall adhere to the GeoDesign geotechnical report which will include mat foundations, <br /> mat foundations with trenches and mat foundations with additional exploration needed. <br /> 7. Structural fill, testing, proof rolling for each foundation shall be done per the Geotechnical Report. The applicant will <br /> provide special inspection and reports for these issues and others to insure compliance with the Report and applicable <br /> building codes. <br /> 8. The applicant must request applicable City of Everett inspections for any of the under-slab utilities installed in conjunction <br /> with the foundations. <br /> 9. Install erosion control measures as determined by the Public Works Inspector, such as silt fence, straw bales, swales, or <br /> erosion blankets. <br /> 10. Flexible connection for utilities are required as indicated in the GeoDesign geotechnical reel e <br /> 11. Driveways from the street to Garage shall be paved. <br /> Public Works Permit Fee Breakdown: <br /> PW Plan Review $20.00 JUN 2 8 2017 <br /> PW Site Inspection $20.00 _ . 1�} <br /> Driveway $25.00 CITY OF EVERETT <br /> City of Everett Official Use Only ACKNOWLEDGEMEN1P0ForliNISIQ1 S <br /> The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> expenses,or causes of action that may arise because of installation and <br /> --- maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) Date for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> FINAL INSPECTION Date 0231(1 <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.