Laserfiche WebLink
r <br /> • New Figure 15A—Developed Conditions Overflow Drainage Concept,providing a conceptual <br /> plan for a private stormwater conveyance system from Lot 2 to the River. <br /> • Preliminary calculations for pipe sizing and backwater analysis. <br /> • Reference documents.—A meeting handout dated April 17,2015,from City summarizing <br /> Hydraulics Report and an email from City dated August 30,2016,defining tailwater elevation to <br /> be used for backwater calculations. <br /> This information is for master planning only. Detailed engineering design is required to implement <br /> stormwater management on each lot. The concepts may be modified with a requirement to satisfy overall <br /> objective of an integrated stormwater management system for RBP. <br /> Riverside Business Park Stormwater Site Plan and Stormwater Quality Pond October 19,2016 <br /> Comprehensive Hydraulic Report Reid iddleton <br /> Amendment 1 -4- <br />