Laserfiche WebLink
• <br /> • <br /> • <br /> LOT 2 LOT 3 LOT 4 LOT 5 LOT 7 <br /> AREA 232.516 SF(5.34 AC) AREA 722,491 SF(16.59 AC) AREA 289,415 SF(0.64 AC) AREA 421,778 SF(9.65 AC) AREA 207,414 SF(4.76 AC) <br /> DRAINS TO SNOHOMISH RIVER DRAINS TO .SNOHOMISH RIVER DRAINS TO SNOHOMISH RIVER DRAINS TO STORMWATER QUALITY POND 2 DRAINS TO SNOHOMISH RIVER <br /> LOT 2 OUTFALL-15"0 STEEL AND LOT 3 OUTFALL-12"0 CPP OR WQ STORM:ON-SITE <br /> OUTFALLMULTIPLE OUTFALLS-16'0 STEEL OUTFALL NORTH OUTFALL-12'0 CPP � � - HIGH FLOW:LOT 4BYPlSS OUTFALL WQ STORM:PUMP.STATIONS 2&3_ OUTFALL UNIDENTIFIED <br /> PEW(FLOW RATE PEAK FLOW RATE KA'ROW ROTE PEAK.FLOW RALE ALLOWED - PEN(FLOW ROTE O <br /> ALLOWED CAPACITY OF OUTFALL PIPES ALLOWED CAPACTIV OF OUTFALL PIPES ALLOWED - CAPACITY OF OUTFALL TO PUMP STATIONS 20 1.79+1.6=3.59 •CFS ALLOWED CAPACITY OF OUTFALL - <br /> DESIGN STORM 25-YEAR.24-HOUR DESIGN STORM 25-YEAR,24-HOUR DESIGN STORM 100-YEAR,24-HOUR DESIGN STORM 100-YEAR,24-HOUR DESIGN STORM 25-YEAR,24-HOUR <br /> rc <br /> DETENTION REQUIRED NONE DETENTION REQUIRED ON-SITE.(NONE WITH URGER OUTFALL) DETENTION REQUIRED TO BE DETERMINED DETENTION REQUIRED ON-SNE DETENTION REQUIRED TO BE DETERMINED <br /> WATER QUALITY ON-SITE WATER QUALITY ON-SITE WATER QUALITY ON-SITE(SEE NOTE 1) - WATER QUALM STDRMWATER QUALITY POND 2 WATER QVAUIt' ON-SITE <br /> TREATMENT TREATMENT TREATMENT TREATMENT TREATMENT <br /> LOT 8 LOT 9 8TH STREET . RIVERSIDE RD ' <br /> BASIN 595,564 SF(13.6]ACI. ROW TO STORMNATER QUAUIY POND 2 MAY BE CONSIDERED.MUST <br /> EAST B <br /> ) AREA 461,350 SF(10.59 AC) AREA 42,563 SF(0.90 AC) AREA 226,925 SF(5.21 AC) . DEMONSTRATE ADEQUATE POND OUTFALL CAPACITY AND INSTALL <br /> NN BASIN:50.530 SF(1.16 AC) DRAINS TO SNOHOMISH RIVER DRAINS TO STORMWATER QUALITY POND 2 ADDITIONAL PUMP CAPACITY.POND CAPACITY AVAILABILITY IS SHOWN ON 1 <br /> EAST BASIN:SNOHOMISH RIVER DRAINS TO SNOHOMISH RIVER REVISED FIGURE 2. <br /> DRAINS TO NN BASIN:STORMWATER QUALITY POND 2 25-YEAR STORM:PUMP STATIONS 1,2,3,&4 <br /> OUTFALL. UNIDENTIFIED OUTFALL HIGH FLOW:BTH ST OUTFALL OR NEW PUMP STATIONt <br /> FAST BASIN:LOT B OUTFALL-36"0 CNP OUTFALL OR STREET WITHTHLLARGE CPP 2. FLOW TE ADEQUATEUA QUALITY POND 2 MAY YE CONSIDERED.MUST <br /> OUTFALL PEAK FLOW RATE OR REPLACED LARGER OUTFALL - TO POND 2(COORDINATE W/8TH ST DRAINAGE) DEMONSTRATE CONVEYANCE CAPACITY,STORMWATER QUALITY <br /> IN/BASIN:PUMP STATION 4 CAPACITY OF OUTFALL AVAILABLE <br /> ALLOWED PEAK ROW RATE PEN(FLOW RATE ALLOWED POND 2 CAPACITY,AND POND OUTFALL CAPACITY.ADDITIONAL PUMP <br /> PEAK FLOW RATE EAST BASIN:CAPACITY OF OUTFALL CAPACITY OF OUTFALL PIPES 2.39+0.43+D.54+2.87=6.23 CFS _ <br /> ALLOWED NW BASIN:0.5 CFS - DESIGN STORM 25-YEAR.24-HOUR ALLOWED TO PUMP STATIONS 1-4 CAPACITY REQUIRED. <br /> DESIGN STORM 25-YEAR,24-HOUR DESIGN STORM 100-YEAR,24-HOUR 25-YEAR TO POND 2 <br /> WTER <br /> DESIGN STORM 3. p=WAQUALRY <br /> DETENTION REQUIRED TO BE'DETERMINED TO BE DETERMINED 100-YEAR TO BYPASS. CIES4 <br /> DETENTION REQUIRED NONE WATER QUALITY DETENTION REQUIRED(NONE WITH LARGER OUTFALL) DETENTION REQUIRED.NONE <br /> ON-SIZE 4. HIGH FLOW=100-YEAR STORM MINUS PUMP CAPACITY <br /> WATER DUALITY ON-SITE TREATMENT WATER QUALITY ON-SITE(SEE NOTE 2) WATER QUALITY 'STORMWATER QUALITY POND 2 <br /> TREATMENT TREATMENT TREATMENT <br /> STORMWATER QUALITY— g <br /> /i"..-�. WETLAND B PUMP STATION 1 POND 1 !1 <br /> PUMP STATION 3 II STDRMWATER QUALITY <br /> (. `` PUMP : 'i <br /> T4 PUMP STATION 2 <br /> POND 2 <br /> RIVERSIDE RD _ <br /> - --- ------ ---- ---- <br /> I <br /> I I <br /> ' <br /> \ / I I 1 <br /> J <br /> is <br /> i <br /> • <br /> i <br /> I / <br /> I <br /> ''\ <br /> � I _�- -� o <br /> . ........ ..:. <br /> • <br /> LOT 8 OUTFALL �`, x:.;..;.. i:.;F,: I .0T 1. 11 n� <br /> ..... <br /> 11 �" <br /> EXIST. 36"0 CMP N. I I• I /- a oZ <br /> `\ I; I lI II N F— <br /> MULTIPLE OUTFALLS m w z0 <br /> EXIST. 18"4 STEEL z <br /> o Dm <br /> giEXIST. 60 STEEL <br /> -- <br /> EXIST. 24"0 STEEL tEw as__..-- <br /> 8TH <br /> STREET OUTFALL $g 9 w <br /> :., �` > <br /> EXIST. 12"O CPP i w W Z <br /> THIS DRAWING IS AN AMENDMENT TO THE EXIST. 8"0 CI OUTFALL EC ap <br /> STORMWATER SITE PLAN (COMPREHENSIVE SCALE IN FELT <br /> HYDRAULICS REPORT), PORT OF EVERETT NORTH OUTFALL — ~O <br /> LOT 3 OUTFALL EXIST. 12'0 CPP <br /> RIVERSIDE BUSINESS PARK DATED APRIL 2000. - - .A D MOD ,DD <br /> AMENDMENT 1 ADDRESSES LOT DRAINAGE ONLY. EXIST. 12"0 CPP LOT 2 OUTFALL <br /> • STREET DRAINAGE TO BE ADDRESSED IN FUTURE EXIST. 15"0 STEEL Fi ure 2A "-1200 <br /> AMENDMENT. - - g '""'"" <br /> CALL 48 HOURS AMENDMENT NT 1 "� <br /> BEFORE YOU DIG NOTE: 2 I ` -- <br /> IF"L'DOES NOT MEASURE 1" ""OCT 2016 <br /> • 1-800-424-5555 ADJUST SCALES ACCORDINGLY. <br /> • <br /> CA 21.2016.001 <br />