My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
415 RIVERSIDE RD 2019-02-14
>
Address Records
>
RIVERSIDE RD
>
415
>
415 RIVERSIDE RD 2019-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 11:35:53 AM
Creation date
1/10/2019 9:20:24 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: Riverside Business Park PUMP TRIBUTARY AREA RUNOFF <br /> BY: KGH (Runoff by Rational Method) <br /> DATE: 6/15/2016 Method:Everett SWMM 2010 <br /> CHECKED BY: HK M= 7.83 For Everett 25 Year Storm <br /> DATE: 8/26/2016 n= 0.582 <br /> LAST UPDATE: 8/26/2016 (Pipe Capacity by Manning's Eqn.) <br /> Pump Station Runoff Calculation <br /> Inc. Time of Rain <br /> Area Runoff Sum Cone Intens Runoff <br /> From To (Acre) Coef. A*C A*C (min) (in/hr) (cfs) <br /> ROW Pump 1 2.56 0.80 2.05 2.05 10.00 2.05 4.20 <br /> ROW Pump 2 0.85 0.64 0.54 0.54 10.00 2.05 1.12 <br /> ROW Pump 3 1.05 0.65 0.69 0.69 10.00 2.05 1.40 <br /> ROW Pump 4 1.91 0.54 1.04 1.04 10.00 2.05 <br /> 2.05 2.12 <br /> 01-1-c <br /> crnGI n <br /> H:\21Cp\16\001 POE Riverside On-Call\SEQUESTERED\Amendment 1\Hydraulic Calcs\Pump Station Rational Calcs.xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.