My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
415 RIVERSIDE RD 2019-02-14
>
Address Records
>
RIVERSIDE RD
>
415
>
415 RIVERSIDE RD 2019-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 11:35:53 AM
Creation date
1/10/2019 9:20:24 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT: Riverside Business Park-POE On-Call(SEQUESTERED) PUMP STATION TRIBUTARY FLOW <br /> BY: KGH (Runoff by Rational Method) <br /> DATE: 8/18/2016 Method:Everett SWMM 2010 <br /> CHECKED BY: HK M= 10.07 For Everett 100 Year Storm <br /> DATE: 8/18/2016 n= 0.586 <br /> LAST UPDATE: 8/18/2016 (Pipe Capacity by Manning's Eqn.) <br /> Riverside Rd Pump Station 4 High Flow <br /> Inc. Time of Rain <br /> Area Runoff Sum Conc Intens Runoff <br /> From To (Acre) Coef. A*C A*C (min) (in/hr) (cfs) <br /> Pump 4 <br /> Riverside 0.75 0.79 0.59 0.59 10.00 2.61 1.54 <br /> Rd <br /> Pump 4 Lot 8 NW 1.16 0.38 0.45 0.45 10.00 2.61 1.17 <br /> Basin <br /> Total Runoff: 2.71 cfs <br /> Pump Design Capacity: 2.87 cfs <br /> Conclusion: Pump can handle Riverside <br /> Rd&Lot 8 NW Basin 100 Year Storm. <br /> Therefore,Pump 4 does not need to be <br /> connected to Riverside Rd Overflow <br /> System. <br /> H:\21Cp\16\001 POE Riverside On-Call\SEQUESTERED\Amendment 1-Calcs CAD working PDFs\Hydraulic Calcs\Pump Station Rational Calcs <br />
The URL can be used to link to this page
Your browser does not support the video tag.