My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
415 RIVERSIDE RD 2019-02-14
>
Address Records
>
RIVERSIDE RD
>
415
>
415 RIVERSIDE RD 2019-02-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2019 11:35:53 AM
Creation date
1/10/2019 9:20:24 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
415
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
359
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Updated figures and tables without the redlined text are included at the end of <br /> Amendment 2. Below is a description of the major modifications made to the <br /> affected figures: <br /> • Figure 2 - Developed Conditions Basin Map (Ponds). Pond#2 Available <br /> Capacity For Water Quality, Table is updated to cross out and reclaim water <br /> quality capacity in Pond 2; Site plan exhibit is modified accordingly to the <br /> table revisions together with the general notes. <br /> • Figure 2A - Developed Conditions Lot Drainage Planning Information. <br /> Tables for Lots 4, 5, 8 and 8th Street are modified to match the drainage <br /> concept; Site plan exhibit is modified accordingly to the table revisions <br /> together with the general notes. <br /> • Figure 15 - Developed Conditions Basin Map (Pumps). Tables for Pumps 1 <br /> through 4 are modified to strike out drainage flow allowances to Lots 4, 5 <br /> and 8 to match the drainage concept; Site plan exhibit is modified <br /> accordingly to the table revisions together with the general notes. <br /> • Figure 15A - Developed Conditions Drainage Concept Lots 2 & 4. Site plan <br /> exhibit is modified to include removal of stormwater runoff from Riverside <br /> Road overpass to claim Pump 1 capacity; Includes 8th Street drainage and <br /> drainage stub for Lot 5 drainage conveyance to the Snohomish River <br /> through existing 8" & 12" outfalls retrofitted with in situ liner; Reduction of <br /> Lot 8 drainage basin to Water Quality Pond 2. <br /> • No modifications were made to Preliminary calculations for pipe sizing and <br /> backwater analysis. Information from these calculations was not updated, <br /> rather it was used to prepare and summarize corroboration information <br /> presented in this amendment. <br /> Descriptions of the new figures introduced in this Amendment 2 are noted below: <br /> • (New) Figure 16 —RBP 100-YR Flow and Pump Capacities—Rational <br /> Method. This table summarizes the adjusted calculated flows and notes the <br /> pump capacity available to convey the flows to the pond. <br /> Riverside Business Park <br /> Apri112,2017 �- <br /> KPFF,Amendment 2 (Pae>/7/) <br />
The URL can be used to link to this page
Your browser does not support the video tag.